My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/26/2018 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2018
>
09/26/2018 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:56:59 AM
Creation date
2/22/2019 8:32:06 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
09/26/2018
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enivonmental Board <br />September 26, 2018 <br />Page 2 <br />APPROVED MINUTES <br />VI. DISCUSSION ITEMS <br /> <br /> A. Watermark 1st Addition <br /> <br /> The Environmental Board reviewed the Preliminary Plat for Watermark on April 27, <br /> 2016. At that time, it was recommended to revisit the Landscape Plan in particular upon <br /> approval of the final plat. <br /> <br /> The first phase of this project is what is now under construction. <br /> <br /> Tree species list was changed to appropriate northern hardwood forest species <br /> Seed mix was changed to show delineated areas of native wet prairie, wet, <br />wetland fringe, commercial turf and sod. <br /> The irrigation system was detailed on the final plane. The developer shows <br />almost everything irrigated from storm water reuse. The native seed areas will be <br />abandoned after the initial plant establishment period. <br /> Tree preservation remains the same <br /> A Wetland Conservation Easement is established <br /> Declaration of Maintenance for Stormwater facilities is written <br /> During the first phase, tile line will be rerouted to the outer perimeter of the <br />project to maintain drainage. Most of the stormwater will go to the new pond on <br />the SW side. There will be a larger pond on the East side. All efforts will be <br />made to keep the water clean after excavation. <br /> HOA Covenant are written. Ownership and maintenance cost for ponds and the <br />lake will be under the HOA covenants. <br /> <br />Ms. Kaufenberg recommend that there should be some educational material pertaining to <br />cultural practices and the ways that it will affect the ponds. <br /> <br /> B. Recycling Updates <br /> <br /> Ms. Schultz presented a new visual of not using plastic bags in collecting recycling <br /> material. <br /> <br /> The recycling numbers for Jan –June 2018 are such; organic (food waste) 9 tons, yard <br /> waste – 150 tons, mixed recycling 798 tons and Recycling Saturday is 88 tons. Grand <br /> total is 1,045 tons. <br /> <br /> Ms. Schultz also shared the processing of the items from Recycling Saturdays. <br /> <br /> Ms. Holmes questioned about the signs and fencing for the organic site. <br /> Ms. Schultz found out that the size of the trash truck would affect the placement and size <br /> of fencing and signs. Therefore, it is on hold for now. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.