Laserfiche WebLink
Local Water Supply Plan Template -December 8, 2015 <br />Projection Method <br />Describe the method used to project water demand, including assumptions for population and business <br />growth and how water conservation and efficiency programs affect projected water demand: <br />Population estimate was linearly extrapolated using Metropolitan Council estimates for 2020, 2030, and 2040. As <br />of 2016, any new population growth will be serviced by the municipal water system. The per capita demands were <br />based on a conservative balance between the Metropolitan Council Water Supply Profile for Lino Lakes and the <br />City's water usage data from the last five years. Maximum day demands were calculated assuming a peak factor of <br />3.5. Demands were interpolated on dates that data were not available. <br />E. Resource Sustainability <br />Monitoring - Key DNR Benchmark <br />Complete Table 8 by inserting information about source water quality monitoring efforts. The list should <br />include all production wells, observation wells, and source water intakes or reservoirs. Additional <br />information on groundwater level monitoring program at: <br />http://www.dnr.state.mn.us/waters/groundwater section/obwell/index.html Add rows to the table as <br />needed. <br />Table 8. Information about source water quality monitoring <br />MN Unique Well # or <br />Surface Water ID <br />Type of monitoring <br />point <br />Monitoring program <br />Frequency of <br />monitoring <br />Monitoring Method <br />240171 <br />0 production well <br />❑ observation well <br />❑ source water <br />intake <br />❑ source water <br />reservoir <br />Routine MDH <br />sampling <br />❑continuous <br />❑hourly <br />❑SCADA <br />0 grab sampling <br />❑ steel tape <br />❑ stream gauge <br />r Routine water <br />lJ daily <br />utility sampling <br />❑ other <br />lJ monthly <br />❑quarterly <br />Dannually <br />110471 <br />E production well <br />❑ observation well <br />❑ source water <br />intake <br />❑ source water <br />reservoir <br />ERoutine MDH <br />sampling <br />ERoutine water <br />utility sampling <br />❑ other <br />❑continuous <br />❑hourly <br />0 daily <br />❑SCADA <br />0 grab sampling <br />❑ steel tape <br />❑ stream gauge <br />lJ monthly <br />❑quarterly <br />Dannually <br />559373 <br />A production well <br />4Routine MDH <br />❑continuous <br />❑hourly <br />0 daily <br />0 monthly <br />❑quarterly <br />❑SCADA <br />0 grab sampling <br />❑ steel tape <br />❑ stream gauge <br />❑ observation well <br />❑ source water <br />intake <br />❑ source water <br />reservoir <br />sampling <br />ERoutine water <br />utility sampling <br />❑ other <br />Dannually <br />554207 <br />A production well <br />MRoutine MDH <br />❑continuous <br />❑hourly <br />❑SCADA <br />❑ observation well <br />❑ source water <br />intake <br />❑ source water <br />reservoir <br />sampling <br />r4 grab sampling <br />❑ steel tape <br />❑ stream gauge <br />M Routine water <br />l4 daily <br />utility sampling <br />❑ other <br />0 monthly <br />❑quarterly <br />Dannually <br />722629 <br />E production well <br />ERoutine MDH <br />❑continuous <br />❑SCADA <br />15 <br />