My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01-14-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
01-14-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 8:52:38 AM
Creation date
2/28/2019 11:23:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/14/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Water Supply Plan Template —December 8, 2015 <br />F. Capital Improvement Plan (CIP) <br />Please note that any wells that received approval under a ten-year permit, but that were not built, are <br />now expired and must submit a water appropriations permit. <br />Adequacy of Water Supply System <br />Complete Table 12 with information about the adequacy of wells and/or intakes, storage facilities, <br />treatment facilities, and distribution systems to sustain current and projected demands. List planned <br />capital improvements for any system components, in chronological order. Communities in the seven - <br />county Twin Cities metropolitan area should also include information about plans through 2040. <br />The assessment can be the general status by category; it is not necessary to identify every single well, <br />storage facility, treatment facility, lift station, and mile of pipe. <br />Please attach your latest Capital Improvement Plan as Appendix 4. <br />Table 12. Adequacy of Water Supply System <br />System Component <br />Planned action <br />Anticipated <br />Construction <br />Year <br />Notes <br />Wells/Intakes <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />IZI Expansion/addition <br />Current - 2040 <br />-Well No. 7 <br />-Well No. 8 <br />-Pump Houses <br />Water Storage Facilities <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />E Expansion/addition <br />2018-2020 <br />-New 1.5 MG <br />Water Tower <br />Water Treatment Facilities <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />2025-2040 <br />-Construction of <br />WTP No. 1 <br />M Expansion/addition <br />Distribution Systems (pipes, valves, <br />etc.) <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />IZI Expansion/addition <br />Current — 2025 <br />-Watermain <br />replacement <br />-Watermain <br />extension <br />Pressure Zones <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />TBD <br />-Additional <br />booster station <br />r Expansion/addition <br />Other: <br />❑ No action planned - adequate <br />❑ Repair/replacement <br />❑ Expansion/addition <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.