Laserfiche WebLink
Lino Lakes Storage Site Performance Agreement page 4 of 10 <br /> Fee <br />1. Sanitary Sewer Trunk Unit Fee ($1,505/unit; 2.92 units/Acre) Paid w/Plat <br />2. City Sewer Availability Fee ($1,408/SAC Unit) No Connection <br />3. Water Trunk Unit Fee ($2,162/unit; 2.92 units/Acre) Paid w/Plat <br />4. City Water Availability Fee ($1,360/SAC Unit) $1,360.00 <br />5. City Surface Water Management Fee Paid w/Plat <br /> <br />Total Estimated (Budget) Developer Fees <br /> $1,360.00 <br /> <br />IV. RECORD DRAWINGS <br /> <br />a. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and roads, <br />constructed by Developer. The as-built survey must include, but is not limited <br />to, proposed and final contours with adequate elevation shots to show <br />conformance, property irons (to be exposed in field), low floor and low <br />opening elevations, and the 100-Year High Water Level (HWL) of all ponds, <br />lakes, and wetland areas. The files shall be drawn in Anoka County NAD 83 <br />Coordinate system and provided in both AutoCAD .dwg and Adobe .pdf file <br />formats. The plans shall include accurate locations, dimensions, elevations, <br />grades, slopes and all other pertinent information concerning the complete work. <br />The Developer shall also submit certified compaction testing results for the <br />site grading operations. <br />b. A summary of the record plan attribute data for the storm sewer, water main, <br />and sanitary sewer structures and pipes shall be submitted in the form of an <br />Excel Spreadsheet as provided by the City Engineer. <br />c. No securities will be fully released until all record drawings have been <br />submitted and accepted by the City Engineer. <br /> <br /> <br />IV. COMPLETION DATE. <br /> <br />If the activities authorized by site and building plan approval are not initiated <br />within twelve (12) months from the final execution of this agreement, then <br />Developer will need to start the site and building plan approval process from <br />the beginning. <br /> <br />V. GUARANTEE. <br /> <br />A. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer. <br />Concurrently with the execution hereof by the Developer, the Developer <br />will furnish to, and at all times thereafter maintain with the City, a cash