My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-24-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
09-24-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:14:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/24/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> <br />good and accepted engineering practices, and which must not interfere with <br />Owner's use of the water tower. <br />(iii) In the event of an emergency power outage, and for the duration of such <br />outage, Tenant may install a temporary portable generator to be located adjacent <br />to the communications water tower. The fuel tank for the generator is self- <br />contained (gasoline or diesel) and must be used in accordance with all applicable <br />fire and health codes. <br />(iv) Related support equipment for six (6) panel antennas, and nine (9) RRUs, <br />including base station and related equipment on the raised platform in the base of <br />the water tower. <br /> The equipment listed in this paragraph is collectively referred to as the "Equipment." <br /> 4. Equipment Installation. Owner approves the installation of the Equipment as placed <br />on the Effective Date of this Agreement. Tenant's subsequent installation and/or maintenance of <br />such Equipment must be done according to plans approved by Owner’s engineering consultant <br />(the "Engineer") and inspected by the Engineer or an agent selected by the Engineer, which <br />approval will not be unreasonably withheld, conditioned or delayed. Tenant will be responsible <br />for the cost of the inspection. Such cost will be reimbursed to Owner within thirty (30) days <br />following receipt of an invoice together with reasonable supporting documentation evidencing <br />such cost. Any damage done to the Leased Property, Owner’s Property, and/or water tower itself <br />by Tenant or its employees or agents, save normal wear and tear, during installation and/or <br />during operation, must be repaired or replaced within thirty (30) days after written notification <br />by the Engineer, at Tenant's expense, and to the Engineer's reasonable satisfaction. All work <br />performed on the water tower must be constructed according to applicable federal, state and local
The URL can be used to link to this page
Your browser does not support the video tag.