My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-13-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
11-13-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:20:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/13/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
178 East 9th Street, Suite 200 | St. Paul, MN 55101 | (651) 286-8450 <br /> <br /> <br />Building a legacy – your legacy. <br />Equal Opportunity Employer | wsbeng.com <br />S:\Community Development\Projects\Planning Cases\Watermark\1st Addition PUD Final Plan-Final Plat\Staff Reports\20181113 CC (FP)\a1 20181004 Engineering Review - Watermark 1st Addition FP.DOCX <br /> <br /> <br />Memorandum <br /> <br />To: Katie Larsen, City Planner <br /> <br />From: Dane Ekdom EIT <br /> Diane Hankee PE, City Engineer <br /> <br />Date: October 4, 2018 <br /> <br />Re: Watermark 1st Addition Final Plat Submittal 09/10/18 <br /> 012443-000 <br /> <br /> <br />As requested by City Staff, WSB and Associates, Inc. has review the revised Final Plat for Watermark 1st <br />Addition in Lino Lakes, MN prepared by Carlson McCain received on September 10, 2018. The following <br />documents were reviewed: <br /> <br /> Watermark 1st Addition Utility & Street Construction Plans prepared by Carlson McCain dated <br />September 7, 2018 <br /> Watermark Phase 1 Grading, Development & Erosion Control Plan revision date September 7, <br />2018 <br /> Watermark 1st Addition Final Plat date stamped September 10, 2018 <br /> Watermark Irrigation plans dated September 10, 2018 <br /> Trail Phase 1 Exhibit prepared by Carlson McCain date stamped July 3rd, 2018 <br /> Watermark 1st Addition Construction Plans for Turn Lanes dated May 11th, 2018 <br /> <br />The following are our review comments that should be responded to in writing by the applicant. <br /> <br />Engineering <br /> <br /> General <br /> <br />The 1st Addition of the Watermark Development is located on the south side of the development, <br />connecting to 21st Avenue North to the south and 20th Avenue North (CSAH 54) to the west. The 1st <br />Addition would consist of 100 single-family homes as well as 93 townhomes including associated <br />infrastructure. <br /> <br />Comments: <br />1. The applicant shall adjust 1st Addition Boundaries to include Outlot J. Storm sewer is <br />proposed to discharge to this outlot and grading will be completed prior to storm sewer <br />installation. <br /> <br /> Grading, Erosion and Sediment Control <br /> <br />The Watermark Development proposes mass grading in multiple phases of the development. Phase <br />1 of the mass grading includes the 1st Addition, a portion of the proposed lake on site, as well the <br />remaining townhomes and adjacent lots to the southwest and north sides of the 1st Addition. Below <br />are the comments for the Phase 1 Grading, Development & Erosion Control Plan. <br /> <br />Comments:
The URL can be used to link to this page
Your browser does not support the video tag.