Laserfiche WebLink
Watermark  <br />Development Agreement  <br />November 26, 2018  <br /> page 3 <br />v. The Developer shall promptly clear dirt and debris within public right‐of‐ <br />ways and drainage and utility easements resulting from construction by  <br />the Developer, its purchasers, builders and contractors within twenty‐ <br />four (24) hours after notification by the City.  The Developer shall be  <br />responsible for all necessary street and storm sewer maintenance,  <br />including street sweeping, until all home construction is completed,  <br />unless otherwise released by the City.   Warning signs shall be placed  <br />when hazards develop in streets to prevent the public from traveling on  <br />them, including detour signs if necessary.  If and when the streets  <br />become impassable, such streets shall be barricaded and closed.  The  <br />Developer shall maintain a smooth, hard driving surface and adequate  <br />drainage on all temporary streets.  <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and  <br />bituminous base course and wear course shall be furnished and installed.  <br />d. Sidewalks, paths and street lighting as required by the City shall be furnished and  <br />installed.  <br />e. Storm sewers, when determined to be necessary by the City Engineer, including  <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be  <br />furnished and installed.  <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building  <br />services and other appurtenances, shall be furnished and installed.  <br />g. Water mains, laterals or extensions, including all necessary building services,  <br />hydrants, valves and other appurtenances, shall be furnished and installed.    <br />h. The Developer shall place iron monuments at all lot and block corners and at all  <br />other angle points on boundary lines.  Iron monuments shall be placed after all  <br />street and lawn grading has been completed in order to preserve the lot markers  <br />for future property owners.  Lot corner irons on the back property line shall be  <br />installed so that the top of the iron corresponds to the finished ground elevation  <br />in accordance with the approved grading plan. Guard stakes shall be  <br />appropriately installed to mark these irons.  <br />i. Landscaping shall be furnished and installed in accordance with the approved  <br />plans, including boulevard trees.  <br />j. The Developer shall arrange for all gas, telephone, cable TV and electric utility  <br />services to the Subdivision in accordance with City Code and State law.  The  <br />Developer is solely responsible for the cost of utility installation.