Laserfiche WebLink
Watermark  <br />Development Agreement  <br />November 26, 2018  <br /> page 8 <br />  <br />Trunk sewer unit charges addressed under this paragraph are in addition to any  <br />SAC charges imposed by Metropolitan Council Environmental Services.  An  <br />estimate of the total charge and the trunk utility credit for developer installed  <br />trunk oversizing is specified in Exhibit C.  <br />f. Trunk Water Connection Fees  <br />The City established trunk utility connection fees to uniformly distribute the  <br />costs of public trunk water infrastructure.  The Trunk Utility Connection Fee  <br />consists of two components; a Trunk Charge and an Availability Charge.  <br />Trunk Charge  <br />  <br />The trunk charge shall be paid at the time of subdivision approval or at the time of  <br />hook‐up, whichever is first.  Residential trunk charges are based on one unit per  <br />dwelling unit.  Commercial/Industrial/Institutional (CII) trunk charges are based on  <br />a factor of 2.92 units per acre.  <br />  <br />Water  $2,162.00 Per Unit  <br />  <br />Availability Charge  <br />  <br />For residential properties, the availability charge shall be paid at the time of  <br />subdivision approval or at the time of hook‐up, whichever is first.   <br />Commercial/Industrial/Institutional availability charges shall be paid at the time  <br />of building permit.  Fees are based on the number of sanitary access charge  <br />(SAC) units assigned by Metropolitan Council Environmental Services (MCES).   <br />Residential uses shall be assigned one unit per dwelling unit unless otherwise  <br />noted by MCES.  <br />  <br />City Water (CWAC)  $1,360.00 Per SAC Unit  <br />  <br />An estimate of the total charge and the trunk utility credit for developer installed  <br />trunk oversizing is specified in Exhibit C.  <br />g. Surface Water Management Area Charges  <br />The City established a trunk area charge to uniformly distribute the costs of  <br />public trunk surface water infrastructure and water quality improvements.  <br />Under the terms of Section 10.3 of the Master Development Agreement the total  <br />amount payable is $2,134,157.10.