Laserfiche WebLink
7 <br />Obstruction Permit Fee (includes administration, recording, review & inspection)…$50.00 plus $.05 per <br />lineal foot <br />Permit Extension Fee (includes administration, recording & review)………………………………$55.00 <br />Delay Penalty ……………………………………………………………………………………….$60.00 <br />for up to three days of non-completion and non-prior notice before specified date. <br />After three days an additional charter of $10.00 per day will be levied <br /> <br />Degradation Fee Formula: <br />This formula covers degradation for depreciation caused by intrusion into the right-of-way. The <br />depreciation applies to the original surface of the right-of-way and to the overlays and seal-coats applied to <br />the surface. The formula includes life expectancy schedules for each and has an estimated cost per square yard <br />based on the quality of the right-of-way surface required for different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per square yard for street, overlay, and seal-coat, multiplied by the <br />depreciation schedule, multiplied by the area of the street patch. <br /> <br />Degradation Fee: (cost per square yard for street overlay, and seal-coat x depreciation schedule rates) <br />x area of street patch = degradation fee. <br /> <br /> <br />UTILITY FEES <br />Sewer Utility Rates (to be considered by separate Ordinance, No. 11-13) <br /> <br />Water Meter Rental $400600.00 (Deposit) / $25 Per <br />Month Additional Accessories $25.00 Per Month <br />Utility Non-Payment Certification Fee $30.00 <br />Underground Utility Permit $50.00 <br />Meter Testing (Our Cost, Delivered To Minneapolis) <br />5/8” – 3/4" Meter Test $50100.00 <br />1” Meter Test $65150.00 <br />1-1/2” – 2” Meter Test <br /> $10025 <br />0.00 <br /> <br />City Trunk Utility Connection Fees <br /> <br />The Trunk Utility Connection Fee consists of two components; a Trunk Charge and an Availability Charge. <br /> <br />Trunk Charge <br /> <br />The trunk charge shall be paid at the time of subdivision approval or at the time of hook-up, whichever is <br />first. Residential trunk charges are based on one unit per dwelling unit. Commercial/Industrial/Institutional <br />(CII) trunk charges are based on a factor of 2.92 units per acre. <br /> <br />Sanitary Sewer $1,5051,573.00 Per Unit <br />Water $2,1622,259.00 Per Unit <br />