My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-10-2018 Council Meeting Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2018
>
12-10-2018 Council Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:05:49 PM
Creation date
2/28/2019 1:32:22 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/10/2018
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Community Development\Projects\Planning Cases\Watermark\1st Addition PUD Final Plan-Final <br />Plat\Engineering\20181119 Engineering Review\1. 20181119 Engineering Review Memo - Watermark 1st Addition.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Katie Larsen, City Planner, City of Lino Lakes <br /> <br />From: Dane Ekdom, EIT, WSB & Associates <br /> Diane Hankee, City Engineer, City of Lino Lakes <br /> <br />Date: November 19, 2018 <br /> <br />Re: Watermark 1st Addition <br /> Final Plat Review Submittal 11/09/18 <br /> 12443-000 <br /> <br /> <br />As requested by City Staff, WSB and Associates, Inc. has review the revised Final Plat for Watermark 1st <br />Addition in Lino Lakes, MN prepared by Carlson McCain received on November 9, 2018. The following <br />documents were reviewed: <br /> <br /> Watermark 1st Addition Utility & Street Construction Plans prepared by Carlson McCain dated <br />November 8, 2018. <br /> Watermark Phase 1 Grading, Development & Erosion Control Plan revision date November 8, <br />2018. <br /> Watermark 1st Addition Final Plat received November 9, 2018. <br /> Watermark Irrigation plans dated November 8, 2018. <br /> Watermark 1st Addition Landscape Plan dated November 8, 2018. <br /> <br />The following are our review comments that should be responded to in writing by the applicant. Applicant <br />responses to comments are in red. Additional engineering review comments below are blue. <br /> <br />Engineering <br /> <br /> General <br /> <br />The 1st Addition of the Watermark Development is located on the south side of the development, <br />connecting to 21st Avenue North to the south and 20th Avenue North (CSAH 54) to the west. The 1st <br />Addition would consist of 100 single-family homes as well as 93 townhomes including associated <br />infrastructure. <br /> <br />Comments: <br />1. The applicant shall adjust 1st Addition Boundaries to include Outlot J. Storm sewer <br />is proposed to discharge to this outlot and grading will be completed prior to storm <br />sewer installation. <br />Outlot J added to 1st addition outline. <br /> <br /> Grading, Erosion and Sediment Control <br /> <br />The Watermark Development proposes mass grading in multiple phases of the development. <br />Phase 1 of the mass grading includes the 1st Addition, a portion of the proposed lake on site, as <br />well the remaining townhomes and adjacent lots to the southwest and north sides of the 1st <br />Addition. Below are the comments for the Phase 1 Grading, Development & Erosion Control Plan. <br /> <br />Comments: <br />1. Open space buffer signs MUST be surveyed and locations shall be shown with final <br />grading as-built. The applicant shall note, grading as-built must be approved prior to <br />release of any building permits.
The URL can be used to link to this page
Your browser does not support the video tag.