Laserfiche WebLink
Watermark <br />Development Agreement <br />December 10, 2018 <br /> page 3 <br />v. The Developer shall promptly clear dirt and debris within public right -of- <br />ways and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within twenty- <br />four (24) hours after notification by the City. The Developer shall be <br />responsible for all necessary street and storm sewer maintenance, <br />including street sweeping, until all home construction is completed, <br />unless otherwise released by the City. Warning signs shall be placed <br />when hazards develop in streets to prevent the public from traveling on <br />them, including detour signs if necessary. If and when the streets <br />become impassable, such streets shall be barricaded and closed. The <br />Developer shall maintain a smooth, hard driving surface and adequate <br />drainage on all temporary streets. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course shall be furnished and installed. <br />d. Sidewalks, paths and street lighting as required by the City shall be furnished <br />and installed. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monumen ts at all lot and block corners and at all <br />other angle points on boundary lines. Iron monuments shall be placed after all <br />street and lawn grading has been completed in order to preserve the lot <br />markers for future property owners. Lot corner irons on the back property line <br />shall be installed so that the top of the iron corresponds to the finished ground <br />elevation in accordance with the approved grading plan. Guard stakes shall be <br />appropriately installed to mark these irons. <br />i. Landscaping shall be furnished and installed in accordance with the approved <br />plans, including boulevard trees. <br />j. The Developer shall arrange for all gas, telephone, cable TV and electric utility <br />services to the Subdivision in accordance with City Code and State law. The <br />Developer is solely responsible for the cost of utility installation.