Laserfiche WebLink
CITY OF LINO LAKES <br />STREETS (101-4301 <br />8/24/2018 <br />2019 <br />2019 <br />Object <br />Actual <br />Actual <br />Budget <br />YTD <br />Base <br />Adjustments <br />Proposed <br />Description <br />Code <br />2016 <br />2017 <br />2018 <br />2018 <br />Budget <br />Requested <br />2019 <br />Budget Detail <br />PERSONAL SERVICES <br />SALARIES <br />4101-000 <br />366,752 <br />365,422 <br />401,972 <br />252,073 <br />415,378 <br />0 <br />415,378 <br />100% Streets Supervisor <br />5 - 100% General Maintenance Workers <br />OVERTIME <br />4102-000 <br />6,820 <br />5,974 <br />8,000 <br />10,835 <br />8,000 <br />0 <br />8,000 <br />50% General Maintenance Worker/Mechanic <br />ON CALUPAGER <br />4105-000 <br />2,060 <br />2,825 <br />2,000 <br />2,267 <br />2,000 <br />0 <br />2,000 <br />.15 FTE PT Office Specialist <br />TEMPORARIES <br />4106-000 <br />26,998 <br />30,247 <br />23,000 <br />19,181 <br />23,000 <br />0 <br />23,000 <br />Overtime: Snowplowing, Street Repairs, Unforeseen <br />WELLNESS PROGRAM <br />4108-000 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Emergencies <br />PERA <br />4121-000 <br />28,172 <br />28,049 <br />30,898 <br />19,888 <br />31,901 <br />0 <br />31,901 <br />SOCIAL SECURITY <br />4122-000 <br />29,750 <br />29,425 <br />33,275 <br />20,481 <br />34,301 <br />0 <br />34,301 <br />Temporaries: Seasonal Summer Maintenance Workers <br />ICMA EMPLOYER CONTRIBUTION <br />4123-000 <br />1,489 <br />1,769 <br />1,746 <br />1,746 <br />1,794 <br />0 <br />1,794 <br />HEALTH INSURANCE <br />4131-000 <br />43,271 <br />46,795 <br />52,117 <br />35,607 <br />53,646 <br />0 <br />53,646 <br />LIFE & DISABILITY INSURANCE <br />4133-000 <br />1,491 <br />1,568 <br />1,382 <br />909 <br />1,423 <br />0 <br />1,423 <br />DENTAL INSURANCE <br />4134-000 <br />2,836 <br />2,977 <br />3,519 <br />2,000 <br />3,519 <br />0 <br />3,519 <br />REEMPLOYMENT INSURANCE <br />4141-000 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />WORKER'S COMPENSATION <br />4151-000 <br />25,110 <br />24,811 <br />27,660 <br />30,696 <br />36,187 <br />0 <br />36,187 <br />534,748 <br />539,861 <br />585,569 <br />395,683 <br />611,149 <br />0 <br />611,149 <br />SUPPLIES <br />Boulevard & median maintenance materials: geo-fabric, <br />fertilizers, pesticides, irrigation components, erosion <br />prevention and sediment control products, grass seed/sod. <br />Construction materials: lumber, plywood, screws, nails, <br />nuts/bolts/washers, bagged concrete, grout, bentonite, <br />stakes/lathe. Equipment wear items: street sweeper center <br />brooms and gutter brooms, plow blades/cutting edges, ditch <br />mower blades, saw blades. Safety items: high visibility <br />vests, shirts, eye protection, ear protection, insect repellent, <br />sunscreen, hardhats, chainsaw PPE. Any products or parts <br />intended for streets maintenance and equipment electrical <br />cords, batteries, rope, tape, cable, glue, paints & solvents, <br />MAINTENANCE SUPPLIES <br />4211-000 <br />7,380 <br />11,537 <br />8,000 <br />4,873 <br />8,000 <br />0 <br />8,000 <br />plumbing supplies, fittings. <br />SHOP PARTS <br />4221-000 <br />13 <br />401 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Traffic regulatory signs, parking signs, warning signs, <br />construction signs, work zone signs, public awareness signs, <br />school signs, trail signs, reflective tape/sheeting, barricades, <br />traffic cones, sign posts, hardware, any materials and <br />supplies purchased specifically for the construction or <br />STREET SIGNS <br />4223-000 <br />9,972 <br />17,010 <br />12,000 <br />2,997 <br />12,000 <br />0 <br />12,000 <br />maintenance of signs & barricades. <br />Hot asphalt, cold asphalt (i.e. UPM bagged and bulk), <br />asphalt emulsion (tack), crackfill material, detackifier (for <br />PATCHING MATERIALS <br />4224-000 <br />97,520 <br />32,298 <br />65,000 <br />15,832 <br />65,000 <br />15,000 <br />50,000 <br />crackfill operations). <br />Regular road salt, treated road salt, bagged sidewalk salt, <br />sand used for snow and ice management, any materials and <br />supplies purchased specifically to facilitate the use of salt <br />SALT/SAND <br />4228-000 <br />44,114 <br />55,871 <br />55,000 <br />8,640 <br />55,000 <br />0 <br />55,000 <br />brine or solid for snow and ice management. <br />Class V, sand (not for winter operations), rock, chip rock, rip - <br />rap, topsoil, compost, mulch, and woodchips. Plastic, metal, <br />GRAVEL AND MISCELLANEOUS <br />4229-000 <br />11,178 <br />3,908 <br />15,000 <br />2,297 <br />15,000 <br />0 <br />15,000 <br />Jor concrete pipes and culverts. <br />