My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-17-2001 EDA Packet
LinoLakes
>
City Council
>
Economic Development Authority (EDA)
>
Packets
>
2001
>
12-17-2001 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 10:58:21 AM
Creation date
3/19/2019 1:19:56 PM
Metadata
Fields
Template:
EDA
EDA Document Type
EDA Packet
Meeting Date
12/17/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br />CITY OF LINO LAKES <br />ECONOMIC DEVELOPMENT AUTHORITY <br />MINUTES <br />DATE <br />MEMBERS PRESENT <br />MEMBERS ABSENT <br />OTHERS PRESENT <br />: March 12, 2001 <br />: J. Bergeson, D. Carlson, C. Dahl, J. O'Donnell, <br />J. Reinert <br />: None <br />: Mary Divine and Linda Waite Smith <br />CONSIDERATION OF MINUTES OF MONDAY, NOVEMBER 13, 2000 <br />EDA Member O'Donnell moved to approve the November 13, 2000, minutes, as <br />presented. EDA Member Carlson seconded the motion. Motion passed unanimously. <br />PUBLIC HEARING: PROPOSED BUSINESS SUBSIDY TO SUMMIT FIRE <br />PROTECTION <br />Ms. Divine advised Summit Fire Protection, a company that designs, manufactures and <br />installs fire suppression systems, has requested tax increment financing (TIF) assistance <br />in the amount of $217,059 for the purpose of constructing a 30,000 square foot facility in <br />the Apollo Business Center. Summit currently is the second largest fire protection <br />company in Minnesota, and currently has location in Savage, Roseville, Rochester and <br />Fargo. The company plans to consolidate the Roseville and Savage locations into this <br />new Lino Lakes facility. The company will employ approximately 60 at this new facility, <br />including management, designers, sales positions and fabricators. The company has <br />committed to hiring at least eight new employees within two years at no less than $22.00 <br />per hour, plus benefits. <br />A public hearing is required by statue when the EDA is considering granting a subsidy <br />that exceeds $100,000. <br />EDA President Bergeson opened the public hearing at 6:05 p.m. <br />Ms. Divine introduced Mr. Quint Rubald, President of Summit Fire Protection, Mr. Frank <br />Zelley, Construction Manager, and Mr. Mark Moore, Representative for Mr. Uhde. <br />EDA Member Dahl moved to close the public hearing at 6:06 p.m. EDA Member <br />Carlson seconded the motion. Motion passed unanimously. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.