My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1973 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
1973
>
1973 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 11:09:57 AM
Creation date
3/22/2019 11:42:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Council Meeting Type
Regular
Ordinance Title
Granting Franchise to Northern States Power Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br />LARGE GENERAL SERVICE (Contd) <br />Determination of Demand The demand in kilovolt -amperes for billing purposes <br />shall be determined by dividing the maximum demand in kilowatts by the <br />monthly average power factor and shall be rounded to the nearest whole kva, <br />but in no month shall the demand to be billed be considered as less than <br />50% of the greatest demand in kva billed during the preceding eleven months <br />nor in any event less than 100 kva. <br />Maximum Demand The maximum demand in kilowatts shall be the greatest 15-minute <br />load during the month for which bill is rendered. <br />Average Power Factor The average power factor is defined to be the quotient <br />obtained by dividing the kilowatt-hours used during the month by the square <br />root of the sum of the squares of the kilowatt-hours used and the lagging <br />reactive kilovolt -ampere -hours supplied during the same period. Any leading <br />kilovolt -ampere -hours supplied during the period will not be considered in <br />determining the average power factor. <br />Minimum Demand to be Billed The monthly minimum billing demand shall not be <br />less than provided above, whether or not energy is used. <br />Standby and Supplementary Service <br />Availability Available at 12,E+00 volts or higher to any large commercial or <br />industrial customer who normally supplies part or all of his electric power <br />requirements from another independent source of power for which the Company's <br />service may be substituted wholly or in part. Customer shall contract for <br />capacity adequate to supply the entire electric requirements for which such <br />service may be used which capacity shall equal or exceed the agreed kva demand <br />for standby to customer's other source of power. Company shall not be obligated <br />to supply capacity in excess of that contracted for. <br />Rate The billing shall be in accordance with Company's Large General Service <br />rate schedule for Service at Primary Distribution Voltage except that the <br />paragraph "Determination of Demand" shall be modified to read as follows: <br />"The demand in kilovolt -amperes for billing purposes shall be determined by <br />dividing the maximum demand in kilowatts by the monthly average power factor, <br />but in no month shall the demand to be billed be considered as less than the <br />agreed standby demand plus 50% of the greatest excess demand in kva over such <br />standby demand billed during the preceding eleven months nor in any event <br />less than 2500 kva." <br />(Continued on following sheet) <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.