My WebLink
|
Help
|
About
|
Sign Out
Home
Search
1973 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
1973
>
1973 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 11:09:57 AM
Creation date
3/22/2019 11:42:17 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Council Meeting Type
Regular
Ordinance Title
Granting Franchise to Northern States Power Company
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />FIRM AND INTERRUPTIBLE LARGE GENERAL SERVICE (Contd) <br />Maximum Demand The maximum demand in kilowatts shall be the greatest 15-minute <br />load during the month for which bill is rendered. <br />Average Power Factor The average power factor is defined to be the quotient <br />obtained by dividing the kilowatt-hours used during the month by the square <br />root of the sum of the squares of the kilowatt-hours used and the lagging <br />reactive kilovolt -ampere -hours supplied during the same period. Any leading <br />kilovolt -ampere -hours supplied during the period will not be considered in <br />determining the average power factor. The average power factor shall be <br />determined for each of the Services. <br />Minimum Demand to be Billed The monthly minimum billing demand for each of <br />the Services shall not be less than provided above, whether or not energy is <br />used. <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.