My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-27-2006 EDA Packet
LinoLakes
>
City Council
>
Economic Development Authority (EDA)
>
Packets
>
2006
>
11-27-2006 EDA Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 3:22:52 PM
Creation date
3/26/2019 3:27:46 PM
Metadata
Fields
Template:
EDA
EDA Document Type
EDA Packet
Meeting Date
11/27/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/08/2000 1666 Coffman Page 1 <br /> Detailed Work Description Report WD002 <br /> Sorted By: Work Description <br /> Work Desc Description <br /> Work Description Description Craft Category AHrs Priority <br /> (� BOILERCHECK Boiler Start-up and Check HTCONT Standard: 7 days <br /> Description Text. Z <br /> This equipment should be cleaned,adjusted and inspected by a qualified heating <br /> contractor <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERCHECKWK1 Weekly Check of Chiller Operation-1 MAINT Standard: 7 days <br /> Descri tion Text: <br /> Perform weekly check of unit during cooling season: <br /> 1.Verify proper oil levels <br /> 2.Check refrigerant sight glasses <br /> 3. Check condensor coils for excessive debris build up <br /> 4. Check condensor fan belts <br /> 5.Check water pressure <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERCHECKWK2 Weekly Check of Chiller Operation-2 MAINT Standard: 7 days <br /> Description Text.- <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERCHECKWK3 Weekly Check of Chiller Operation-3 MAINT Standard: 7 days <br /> Description Text.- <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERCHECKWK4 Weekly Check of Chiller Operation-4 MAINT Standard: 7 days <br /> Description Text.- <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERSHUTDO Fall Shut Down of Chiller ACCONT Standard: 7 days <br /> WN <br /> Description Text: <br /> .1.Check unit and note any problems <br /> 2. Shut down unit and close service valves as a propriate <br /> Work Description Description Craft Category Est Hrs Priority <br /> CHILLERSTART Spring Start-up of Chiller ACCONT Standard: 7 days <br /> Description Text.- <br /> Work Description Description Craft Category Est Hrs Priority <br /> COMPRESSORCH Compressor Operation Check MAINT Standard: 7 days <br /> ECK <br /> Description Text.- <br /> ' <br /> .Verify proper oil level <br /> 2.Check refrigerant sight glass <br /> 3. Check condensor coils for excessive debris build up <br /> 4 Oil fan motor as needed <br />
The URL can be used to link to this page
Your browser does not support the video tag.