Laserfiche WebLink
LINO LAKES ECONOMIC DEVELOPMENT AUTHORITY <br />AGENDA ITEM 3A <br /> <br /> <br />STAFF ORIGINATOR: Michael Grochala <br /> <br />MEETING DATE: April 11, 2016 <br /> <br />TOPIC: i. Consider Resolution No. 16-01, Designating Building as <br />Structurally Substandard, 49 Club <br /> <br /> ii. Consider Resolution No. 16-02, Approving Preliminary <br />Development Agreement with DM Land, LLC <br /> <br /> <br />VOTE REQUIRED: 3/5 <br /> <br />BACKGROUND <br /> <br />The 49 Club, located at the corner of Hodgson Road and County Road J, has been vacant since <br />approximately 2003. The site has become a blighted location with illegal dumping and <br />vandalism taking place on a regular basis. The city has received numerous complaints regarding <br />the property. The site has been the topic, along with the neighboring 17 acre Jensen property, of <br />several development proposals. However, none have advanced past the concept phase due to a <br />number of complicating factors including the need for public improvements, multiple property <br />owners, and council concern over the intensity of prior commercial development proposals. <br /> <br />In March of 2015 LHB Corporation was retained to determine the eligibility of the property for <br />TIF purposes and to document the condition of the building. As noted in the report the buildings <br />are structurally substandard to a degree requiring substantial renovation or clearance. Staff has <br />been working with the owner of the property regarding potential demolition of the buildings <br />either as a City project or by the owner. The owner is proposing to remove both the principal <br />structure and accessory garage with their own contractor. <br /> <br />Staff is very interested in this project as a means to clean up the site, eliminate the blight and <br />assist redevelopment efforts. The use of Tax Increment Financing (TIF) has previously been <br />discussed to help offset utility, road or land assemblage costs to facility redevelopment of the <br />corner. <br /> <br />However, removal of the building has the potential to eliminate one of the financial tools <br />available to assist with redevelopment. In order to establish a TIF District after demolition, the <br />request for certification of the TIF District must be filed with the County within three years of <br />the parcel being occupied by a substandard building. An actual project would need to occur <br />within 4 years of district certification or the site would be dropped from the district and no longer <br />eligible for TIF. <br />