My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/02/2019 EDAC Packet
LinoLakes
>
Advisory Boards & Commissions
>
Economic Development Advisory Committee
>
Packets
>
2019
>
05/02/2019 EDAC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2022 12:11:07 PM
Creation date
4/26/2019 1:23:12 PM
Metadata
Fields
Template:
EDAC
EDAC Document Type
EDAC Packet
Meeting Date
05/02/2019
EDAC Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A building permit has been issued for Watermark. <br />The City received an application for Saddle Club 4t" Addition. <br />Love to Grow On is under construction. <br />All Season's Rental will break ground. <br />The city is finishing up the design on Water Tower #3 and bids will go out in May. <br />A feasibility study for Well #7 is in progress. <br />The City is in land negotiations for construction of the northeast drainage channel. <br />Dunkin Donuts is going in by McDonalds. Another user is looking at the southeast corner. <br />Birch Street, from Deerwood Ln to Centerville Roadwill be paved this Spring. <br />County Road J, from Centerville Road to I-35E has seen issues with increased traffic. <br />Senator Chamberlain is working on legislation for state funding to prepare a preliminary <br />design of the corridor. <br />10 Business Retention Surveys returned. <br />ADJOURNMENT <br />The meeting was adjourned at 9:03 A.M. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.