My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-06-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
05-06-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
5/7/2019 11:39:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/06/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WS – Item 7 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 7 <br /> <br /> <br />Date: May 6 , 2019 <br /> <br />To: City Council <br /> <br />From: Diane Hankee, City Engineer <br /> <br />Re: Birch Street (CSAH 34) Resurfacing Project from Deerwood Lane to <br />Centerville Road <br /> <br /> <br />Background <br /> <br />Anoka County is planning a resurfacing project in 2019 along Birch Street (County State <br />Aid Highway 34) from Deerwood Lane to Centerville Road. The resurfacing/reclamation <br />project, as proposed, maintains the existing roadbed and does not include earthwork or <br />road widening. <br /> <br />As part of the project, the City requested that the County review the intersection with <br />Birch Street and Blackduck Drive. Multiple options were evaluated, including <br />designated right and left turn lanes and a roundabout option. The options required <br />additional right of way and storm water management. This additional process would <br />delay the project at a minimum an additional year. The right and left turn lane option as <br />proposed by Anoka County showed restricting access at Pheasant Run and Red Birch <br />Court to right in/out. City staff recommends continuing to work with Anoka County on <br />evaluating the Blackduck Drive intersection, and other intersections along the corridor, <br />beyond the current proposed resurfacing project. <br /> <br />The minor changes with the project: <br /> <br />• Replace the twin culverts west of Wild Turkey Trail. <br />• Add 8 foot shoulder in the area of Pheasant Hills Drive (currently a gravel <br />shoulder) <br />• Crown correction (superelevation) around White Oak Road <br />• Bring trail intersections with City streets up to ADA standards. <br /> <br />Anoka County is funding the resurfacing project through their State Aid allotment. They <br />plan to advertise the project the first week of May with the award of bid a month <br />following. Construction could start as early as mid-June, 2019. The Birch Street <br />Resurfacing Project construction plan needs to be signed by the City Engineer. <br /> <br />In the fall of 2019 Anoka County plans to start the public planning process for future <br />improvements to Birch Street (CSAH 34) from Deerwood Lane to Ware Road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.