My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-05-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
08-05-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
7/31/2019 4:13:03 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/05/2019
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> <br />by an Applicant as a condition of consent to use to City’s Public Right-of-Ways or <br />to obtain a Small Wireless Facility Permit. <br /> <br />(6) Reimbursement of City Costs. The Department may determine that it requires the <br />services of an expert in order to evaluate a Small Wireless Facility Permit <br />Application. In such cases, the Department shall not issue a Small Wireless Facility <br />Permit pursuant to the Application unless the Applicant agrees to reimburse the <br />Department for the actual, reasonable costs incurred for the services of a technical <br />expert. <br /> <br />§ 305.16 SEVERABILITY <br /> <br />(1) Severability. If any section, subsection, subdivision, paragraph, sentence, clause, or <br />phrase of this Chapter or any part thereof is for any reason held to be <br />unconstitutional, invalid, or ineffective by any court of competent jurisdiction, such <br />decision shall not affect the validity or effectiveness of the remaining portions of <br />this Chapter or any part thereof. <br /> <br />SECTION TWO: Section 304.03(1) of the Lino Lakes City Code is hereby amended, as <br />follows: <br /> <br />§ 304.03 PERMIT REQUIREMENT. <br /> <br />(1) Permit required. Except as otherwise provided in this code, no person may obstruct <br />or excavate any right-of-way, including county roads or state highways within the <br />city, collocate a small wireless facility, or install or replace a wireless support <br />structure in addition to collocate a small wireless facility on the wireless support <br />structure without first having obtained the appropriate permit from the city. <br /> <br />(a) Excavation permit. An excavation permit is required to excavate that part of the <br />right-of-way described in the permit and to hinder free and open passage over the <br />specified portion of the right-of-way by placing facilities described therein, to the <br />extent and for the duration specified therein. <br /> <br />(b) Obstruction permit. An obstruction permit is required to hinder free and open <br />passage over the specified portion of right-of-way by placing equipment described <br />therein on the right-of-way, to the extent and for the duration specified therein. <br />An obstruction permit is not required if a person already possesses a valid <br />excavation permit for the same project. <br /> <br />(c) Small wireless facility permit. A small wireless facility permit is required to <br />collocate a small wireless facility in the right-of-way or to install or replace a <br />wireless support structure in the right-of-way in addition to collocating a small <br />wireless facility on the wireless support structure, to the extent and for the <br />duration described in Chapter 305 of the Lino Lakes City Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.