Laserfiche WebLink
CITY COUNCIL <br />AGENDA ITEM 6D <br />STAFF ORIGINATOR: Diane Hankee PE, City Engineer <br />MEETING DATE: June 24. 2019 <br />TOPIC: Consider Resolution No. 19-80, Approving Change Order No. 1, <br />2019 Mill and Overlay Project <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />Staff is requesting council approval of Change Order No. 1 for the 2019 Mill and Overlay <br />Project. <br />BACKGROUND <br />On April 8, 2019. the City Council awarded the bid for the 2019 Mill and Overlay Project to <br />North Valley, Inc. in the amount of $546,809.69. Construction of the project began in early <br />May. Shortly after the bituminous base course was installed, it was discovered that two <br />watermain services and a main line valve began to leak. Observations during the watermain <br />repairs identified corroded bolts at the gate valves. Final paving has been delayed due to the <br />watermain concerns within the project area. <br />At the June 3, 2019, work session WSB presented a memorandum detailing the conclusions <br />from the watermain repairs and recommendations for moving forward with the project. It is <br />recommended to replace the gate valve bolts and to adjust the paving specification on vibratory <br />equipment to reduce the impact on the service connections. During the work on the gate <br />valves, we will evaluate the ability to achieve compaction due to water table and soil type, as it <br />relates to the potential settlement. We will then make a recommendation to pave the wear <br />course (second lift of bituminous) towards mid -November, 2019, or to postpone into 2020 to <br />allow additional time for possible settlement. Roadway prep work would be completed to <br />prepare the site for the winter plow season if postponed. <br />Change Order No. 1 to replace the bolts on the gate valves and appurtenant work is in the <br />amount of $149,100.00. The bolt replacement on this project will be funded through the City's <br />Utility Fund. The 2019 Mill and Overlay Project contract with North Valley, Inc. with Change <br />Order No. 1 would be increased to $695,909.69. <br />WSB and Associates has submitted a proposal to complete the construction services for the <br />gate valve bolt replacement and appurtenant work in the amount of $11,064.00. <br />RECOMMENDATION <br />Staff is recommending approval of Resolution No. 19-80 for Change Order No. 1 in the amount <br />of $149,100.00 for the 2019 Mill and Overlay Project and construction services in the amount <br />of $11,064.00. <br />