My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/06/2019 Environmental Board Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Minutes
>
2019
>
02/06/2019 Environmental Board Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 2:11:29 PM
Creation date
9/10/2019 3:13:09 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Minutes
Meeting Date
02/06/2019
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enivornmental Board <br />February 6, 2019 <br />Page 4 <br />APPROVED MINUTES <br />There is a wide diversity of plant materials proposed for this site. Plants on the <br />county road right of way need to be moved back. Also for site purposes, the city <br />requires that trees and shrubs be located at least 30 feet from a corner. <br />Stormwater Pollution Prevention Plan <br /> <br />This project will need to have an NPDES/Construction Stormwater permit, and full <br />SWPPP submitted. The applicant must provide the name, phone number and the <br />certification of their Construction Stormwater permit inspector, as well as a means of <br />contact. <br />The permit holder of the Construction Stormwater Permit must submit the required <br />weekly site inspection report to the City immediately after each inspection. All <br />corrective action documentation must be emailed to the City upon completion. <br /> <br />Although the developer discusses concrete washout in the SWPPP, the developer <br />must identify a concrete washout area on the plan. <br /> <br />Tree Preservation <br /> <br />Trees and shrubs on the western edge will be left in place and protected from <br />construction. A tree inventory was completed. Trees to be saved must have a tree <br />preservation plan completed <br /> <br />Lighting <br /> <br />Lighting appears to conform to the no property line spill rule, and fixtures are of the <br />low-profile, downward focused cut-off type lens. <br /> <br />*Road is being widened on Hodgson & Country Rd J to allow for turn lanes. <br /> <br />Sidewalks will be added along County Rd J and the inteior development roads. The <br />trail existing in Woodridge will connect. <br /> <br />Lots to the north are still on septic. Mr. Asleson will check to see if there is futher <br />discussion to include the lots in this project. <br /> <br />Mr. Asleson recommended to approve and forward to Planning and Zoning <br />Committee <br /> <br />Ms. Andrzejewski made a MOTION to move concept plan forward to Planning and <br />Zoning with the Environmental Board comments and recommendations. Ms. <br />Kaufenberg seconded motion. Approved 5-0 <br /> <br />VII DISCUSSION ITEMS <br /> <br /> A. 2019 Goals <br />
The URL can be used to link to this page
Your browser does not support the video tag.