Laserfiche WebLink
<br /> 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM Memorandum <br /> <br />To: Katie Larsen, City Planner, City of Lino Lakes <br /> <br />From: Diane Hankee, City Engineer, City of Lino Lakes <br /> Dane Ekdom, EIT, WSB & Associates <br /> <br />Date: March 29, 2019 <br /> <br />Re: Lyn gblomsten Senior Communities <br /> Plan Review, 01/14/19 Preliminary Plat Submittal <br /> 012369-000 <br /> <br /> <br />As requested by City Staff, WSB and Associates, Inc. has reviewed the Preliminary Plat for the <br />Lyngblomsten Senior Communities site in Lino Lakes, MN received on March 11, 2019. The following <br />documents were reviewed: <br /> <br />• Preliminary Civil Construction plans dated March 11, 2019. <br />• Preliminary Plat prepared by Loucks, received on March 11, 2019. <br />• Stormwater Management Report prepaired by AJA Inc., dated March 11, 2019. <br /> <br />Applicant responses to previous comments are shown in red. Additional comments below are shown in blue. <br />The following are our review comments that should be responded to in writing by the applicant. <br /> <br />Engineering <br /> <br />• General <br /> <br />The Lyngblomsten project is proposed on a 20.74 acre site at the northwest corner of the Hodgson <br />Road (CSAH 49) and Ash Street (CR J) intersection. The City completed a master plan of this area and <br />the area to the east of Hodgson in 2006. This development meets the goals of the master plan. <br /> <br />Comments: <br />1. Xcel Energy has overhead power along the east side of the site. The applicant shall <br />work with Xcel on a design to relocate. <br />Response: This is acknowledged and the team will work with Xcel energy. <br />2. The Civil plans have multiple layers turned on, specifically the utility sheets. The <br />applicant should turn off background layers. <br />Layers have been modified. Please advise if additional clarification is needed <br />The applicant should turn off the spot elevation call-outs. Contours and Contour labels <br />can be left on. <br /> <br />• Grading Plan <br /> <br />The Lyngblomsten development is proposing grading of the entire site in one phase. This includes <br />protection of an existing wetland, grading a new storm water pond, and grading roadway and site pads. <br /> <br />1. The applicant shall call out the emergency overland flow (EOF) elevation (with a flow <br />arrow) on the grading plan for the proposed pond and the existing wetland. The EOF <br />should be 1 foot above the HWL and 3.0 feet below the lowest adjacent building <br />opening elevation. <br />EOF and flow arrows have been added to the grading plan. EOT- and high water level <br />elevations hare been verified per the city comment.