Laserfiche WebLink
<br />K:\012972-000\Admin\Contract\2. Construction\20190408 Design Fee Proposal.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM April 8, 2019 <br /> <br /> <br /> <br /> <br />Mr. Michael Grochala <br />Community Development Director <br />City of Lino Lakes <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br /> <br /> <br />Re: Proposal for Construction Services for 2019 Mill & Overlay Street Improvements Project <br />WSB Project No.R-012972-000 <br /> <br />Dear Mr. Grochala: <br /> <br />WSB & Associates, Inc. is pleased to present to you this proposal for construction services <br />associated with the City’s 2019 Mill and Overlay Street Improvements Project. This would be <br />subsequent to the City Council awarding the construction contract for the project to North valley, <br />Inc. in the amount of $546,809.69. <br /> <br />The City of Lino Lakes is requesting assistance with design of its 2019 Mill and Overlay Project. <br />The streets designated for rehabilitation are local streets as determined by their OCI ratings <br />established in the City’s Pavement Management Study. A summary of the project site is <br />described as follows: <br /> <br />Project Understanding <br /> <br />A summary of the project scope is described as follows: <br /> <br />Street & Parking Lot Improvements, Full Depth Reclamation <br />• Sherman Lake Road <br />• Fire Station No. 1 Parking Lot Improvements <br />• Deerwood Lane (Alternate) <br /> <br />Street Improvements, Mill and Overlay <br />• Pheasant Hills Drive <br /> <br />Project scope to include minor curb and gutter replacement and storm sewer repair <br /> <br />Scope of Engineering Services <br /> <br />WSB is pleased to provide professional construction engineering services for the 2019 Mill and <br />Overlay Street Improvements Project including contract administration, construction observation, <br />construction staking, and public involvement with project stakeholders. Below is a detailed <br />description of the engineering services and WSB’s proposed approach. <br /> <br />I. Construction Services <br />a. Project Management/Contract Administration <br />Contract Administration includes holding meetings with the contractor & City of Lino <br />Lakes (preconstruction & weekly construction), processing monthly quantities for pay <br />vouchers, and communicating with residents on a regular basis.