My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04-22-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
04-22-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
10/16/2019 11:58:29 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/22/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br />As approved with the preliminary plat, Ivywood Curve road right-of-way width is 50 feet <br />and the paved roadway width is 28 feet back to back. This is consistent with NorthPointe <br />2nd and 6th Addition. <br /> <br />Approximately 7 feet of road right-of-way is being dedicated along Cedar Street to create <br />a full 80 foot wide road right-of-way corridor. Per the City’s Transportation Plan, an <br />overpass on Cedar Street is proposed over I-35E in the future. <br /> <br />Staff comment: Ivywood Curve has been revised to Ivywood Avenue. <br /> <br />Easements <br /> <br />Standard drainage and utility easements at least 10 feet wide are provided along all lot <br />lines. A 25-37 foot wide easement is dedicated along the I-35E and Cedar Street covering <br />the berms, landscaping and drainage. <br /> <br />A drainage and utility easement has been dedicated over all of Outlot A. <br /> <br />Storm Water Management and Erosion and Sediment Control <br /> <br />Per the July 9, 2018 Stormwater Management Plan, the site will include approximately <br />3.9 acres of new impervious surfaces including the streets, sidewalks, paths, driveways, <br />and rooftops. Pond 500 located in NorthPointe 5th Addition will be enlarged as a part of <br />the development. The majority of the improved impervious areas will be collected in <br />storm sewers and discharged into Pond 500. Some back yards will discharge directly to <br />the pond, to the wetland or to the I-35E right of way ditch. Ultimately, all of the site <br />runoff will flow to ACD 3. <br /> <br />Utilities <br /> <br />Public water, sanitary and storm sewer utilities will be installed within the development. <br /> <br />Sanitary Sewer <br /> <br />An 8” sanitary sewer pipe will extend from NorthPointe along Dogwood Street and serve <br />the site. <br /> <br />Watermain <br /> <br />An 8” watermain will extend from NorthPointe along Dogwood Street and serve the site. <br /> <br />Public Land Dedication <br /> <br />The City will require $82,600 cash in lieu of land dedication. NorthPointe Park abuts the <br />development to the south and serves this area. An 8.5 foot wide bituminous trail will <br />extend south of Ivywood Curve and connect to the existing trail in NorthPointe Park.
The URL can be used to link to this page
Your browser does not support the video tag.