Laserfiche WebLink
<br />1. The applicant shall show that the existing FEMA floodplain boundary is not encroaching on any <br />proposed lots. <br />Note: this is different from just taking the elevation contour as they did in the floodplain exhibit, as the <br />actual FEMA boundary sometimes doesn't follow correct elevations. <br />The floodplain line shown is the FEMA Floodplain. <br />2. The applicant shall provide a cut/fill analysis of the existing/proposed floodplain boundary to show <br />there is not a net fill within the floodplain. <br />There is no floodplain fill on the site. <br />3. The applicant shall note that if the existing floodplain is encroaching on any lots, a CLOMR/LOMR <br />would need to be completed. <br />Not applicable. The floodplain doesn’t encroach onto the lots. <br /> <br />4. The applicant shall note that if changes are being made to the FEMA floodplain, new floodplain <br />over the pond is shown, then a new or amended LOMR for the area will be required. <br /> Comment noted. <br />5. Please label the FP elevation and verify 2 feet of freeboard is maintained between the FEMA flood <br />plain elevation and the low floor of proposed and existing adjacent buildings. <br />The floodplain shown is at the 100-yr HWL of the pond (917.4). As discussed the At the time the <br />existing houses were constructed the pond was modeled pre Atlas 14. This was approved with the <br />Northpointe PUD. Eastside villas lowers the 100-YR HWL from 917.5 to 917.4 (Atlas 14). <br /> <br />• Drainage and Utility Easements <br /> <br />Generally, roadways are proposed within right-of-way and lots include standard drainage and utility <br />easements. The applicant shall provide adequate drainage and utility easements over surface water <br />management features. <br /> <br />Comments: <br />1. The applicant shall provide necessary drainage and utility easements for the swale in the rear lots of <br />Block 1, or add more storm sewer crossings underneath the berm as previously noted. <br /> <br />• Development Agreement <br /> <br />A development agreement will be required with the final plat. A street light maintenance agreement shall <br />also be required prior to the issuance of building permits. Comment noted. To be provided by owner. <br /> <br />• Stormwater Maintenance Agreement <br /> <br />The stormwater maintenance for public facilities will be covered under the City’s Programmatic Stormwater <br />Management Agreement. Comment noted. <br /> <br />• Permits Required <br /> <br />1. NPDES General Construction Permit <br />This has been obtained and has been previously submitted to the city. <br />2. City of Lino Lakes Zoning Permit for construction <br />This will be obtained prior to construction. <br />3. Minnesota Pollution Control Agency Sanitary Sewer Extension Permit <br />MPCA SSWR permit has been submitted to the city to be signed and returned so we can <br />submit to the MPCA. <br />Total units on permit application is incorrect – should be 32 units, not 20. <br /> This has been updated with 32 lots shown on the app. This has been submitted to MPCA. <br />4. Minnesota Department of Health This is in process. Received <br />5. Rice Creek Watershed Permit for Erosion and Sediment Control <br />Remaining CAPROC items submitted to RCWD 3/7/19. Were contacting RCWD for <br />status. <br />6. 6. MnDOT permit will be required for work within MnDOT Right-of-Way. Not applicable at <br />this time. <br /> <br />If you or the applicant has any questions regarding these comments, please contact Dane Ekdom at (763) <br />762-2815 or dekdom@wsbeng.com.