My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-10-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
06-10-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:47 PM
Creation date
10/16/2019 12:09:17 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/10/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Saddle Club 4th Addition <br />Development Agreement <br />June 10, 2019 <br /> page 2 <br />5. Permits. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, Regional and <br />Local jurisdictions prior to the commencement of site grading or construction and prior <br />to the City awarding construction contracts for public improvements. <br />6. Developer Improvements. The Developer shall secure a contractor to install these <br />improvements, hereinafter referred to as the “Developer Improvements,” which <br />contractor shall be approved by the City in its absolute discretion. The cost of <br />Developer Improvements is as shown on Exhibit C attached hereto. All Developer <br />Improvements shall require City inspection and approval and, where appropriate, the <br />approval of any other governmental agency having jurisdiction. The Developer shall <br />construct and install at the Developer's expense the following improvements according <br />to the following terms and conditions: <br />a. Site Grading – As provided for in the Grading Agreement, dated October 24, <br />2018. <br />b. Grading and Erosion Control – As provided for in the Grading Agreement, dated <br />October 24, 2018. <br />c. Final street grading, subbase, gravel base, concrete curb and gutter, and <br />bituminous base course and wear course shall be furnished and installed. <br />d. Sidewalks, paths and street lighting as required by the City. <br />e. Storm sewers, when determined to be necessary by the City Engineer, including <br />all necessary laterals, catch basins, inlets and other appurtenances, shall be <br />furnished and installed. <br />f. Sanitary sewer mains, laterals or extensions, including all necessary building <br />services and other appurtenances, shall be furnished and installed. <br />g. Water mains, laterals or extensions, including all necessary building services, <br />hydrants, valves and other appurtenances, shall be furnished and installed. <br />h. The Developer shall place iron monuments at all lot and block corners and at all <br />other angle points on boundary lines. Iron monuments shall be placed after all <br />street and lawn grading has been completed in order to preserve the lot <br />markers for future property owners. Lot corner irons on the back property line <br />shall be installed so that the top of the iron corresponds to the finished ground <br />elevation in accordance with the approved grading plan. Guard stakes shall be <br />appropriately installed to mark these irons. <br />i. Landscaping shall be furnished and installed in accordance with the approved <br />plans.
The URL can be used to link to this page
Your browser does not support the video tag.