Laserfiche WebLink
<br /> Anoka County 2019 <br />Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> <br /> 111 <br />112B4.4.1.2 Municipality Hazard Vulnerability <br />In many instances individual municipalities have <br />specific vulnerabilities to hazards that differ from <br />the countywide vulnerabilities. This differentiation <br />can exist due to factors such as geographic <br />location, topography, geologic differences, and <br />proximity to manmade hazards. <br /> <br />In addition to this summary section, within the <br />discussion of each hazard in Section 4.4 Hazard <br />Analysis, there is narrative identifying the specific <br />municipalities or areas of the county that have <br />been affected by hazards, the extent of impact <br />and the probability of future occurrence in Anoka <br />County. The table below summarizes each <br />jurisdiction’s specific vulnerability to each <br />identified hazard. <br /> <br />ANOKA COUNTY – LIKELIHOOD OF POTENTIAL HAZARD INCIDENT OCCURRING * <br />Very Likely=3 <br />Likely=2 <br />Possible=1 <br /> <br /> <br />Jurisdiction Flooding Pandemic Thunderstorm Tornado Winter storm Wildfires Hazmat Active Violence / Active Shooter Terrorism Urban Fire Anoka County 2 1 3 2 3 3 3 1 1 3 <br />Andover 2 1 3 2 3 3 3 1 1 3 <br />Anoka 2 1 3 2 3 1 3 1 1 3 <br />Bethel 1 1 3 2 3 3 3 1 1 2 <br />Blaine 1 3 1 2 1 2 2 1 3 2 <br />City of Nowthen 1 1 3 2 3 3 3 1 1 1 <br />Centerville 2 1 3 2 3 1 3 1 1 3 <br />Circle Pines 1 1 3 2 3 1 3 1 1 3 <br />Columbia Heights 1 1 3 2 3 1 3 1 1 3 <br />City of Columbus 1 1 3 2 3 3 3 1 1 1 <br />Coon Rapids 2 1 3 2 3 3 3 1 1 3 <br />East Bethel 1 1 3 2 3 3 3 1 1 2 <br />Fridley 2 1 3 2 3 1 3 1 1 3 <br />Ham Lake 1 1 3 2 3 2 3 1 1 2 <br />Hilltop 1 1 3 2 3 1 3 1 1 3 <br />Lexington 1 1 3 2 3 1 3 1 1 3 <br />Lino Lakes 2 1 3 2 3 3 3 1 1 3 <br />Linwood Township 1 1 3 2 3 3 3 1 1 1 <br />Oak Grove 2 1 3 2 3 3 3 1 1 2 <br />Ramsey 2 1 3 2 3 3 3 1 1 3 <br />St. Francis 2 1 3 2 3 3 3 1 1 2 <br />Spring Lake Park 1 1 3 2 3 1 3 1 1 3 <br />Totals 32 22 66 44 66 50 66 22 22 55 <br />* Likelihood of occurrence in any single year. <br /> <br />Multi-hazard Requirement §201.6(c)(2)(iii): <br />For multi-jurisdictional plans, the risk <br />assessment must assess each jurisdiction’s <br />risks where they vary from the risks facing <br />the entire planning area. <br />FMA FEMA 299 Guidance: The Plan should <br />be coordinated with, and ideally developed in <br />cooperation with, all of the local jurisdictions <br />within the geographical area <br />A. Does the plan include a risk assessment <br />for each participating jurisdiction as needed <br />to reflect unique or varied risks? <br />D. Does the plan include the probability of <br />future events (i.e., chance of occurrence) for <br />each hazard addressed in the plan?