My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
10/16/2019 3:45:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Anoka County 2019 <br />Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> <br /> 124 <br />For example, if the library was closed for 7 days (loss of function) and then resumed operations <br />from an empty trailer rented for $10 per day for the next 90 days, the displacement cost would <br />be $900 (90 days x $10 per day). <br /> <br />For residences the cost of displacement would be the cost of alternate facilities and the average <br />time of residential construction in Anoka County. <br /> <br />If content value is unknown the following uplift factors can be applied to the structure value: <br /> <br />• Residences – 20% <br />• Agriculture – 30% <br />• Government – 40% <br />• Commercial – 60% <br /> <br />Cubic yards calculations are based on the structure’s square feet and the estimated damage. <br />Then using appropriate factors to estimate burnable, soil, metal and building demolition debris. <br />Disposal costs per cubic yard and landfill acres costs are provided by local sanitation officials. <br /> <br />If square footage is unknown an approximate square footage can be calculated from the <br />structure cost. For example, use the typical governmental and commercial construction cost in <br />the county and divide that into the structure cost. If construction cost is $200 per square foot <br />and the structure value is $1,000,000 the approximate square footage is 5,000 square feet. <br /> <br />For Residential square footage use the median cost of housing in the county and divide that by <br />the dollar per square foot building cost across the county. The median value is currently <br />$121,500 and the estimate is $150 per square foot. <br /> <br />Response, evacuation, recovery and other costs are calculated using a factor times total <br />structure value. The premise is that structure loss is directly related to the impact and extent of <br />the hazard and therefore can be used as a basis for costs estimates. <br /> <br />Wages lost are a direct calculation of displaced days, structure capacity or workforce and the <br />average daily wage for the jurisdiction <br />
The URL can be used to link to this page
Your browser does not support the video tag.