My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
10/16/2019 3:45:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Anoka County 2019 <br />Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> <br /> 212 <br />2.1.6 Review & cleaning of ponding system to determine functionality <br />and storage (old system needs to be reviewed to ensure still <br />functioning as designs + new Atlas 14 standards). <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Coon Rapids Public Works 2500000 3000000 City Budget <br />and <br />Watershed <br />Funds <br />Continued <br />2.1.7 Consideration of permanent levee/flood protection for known <br />areas of concern <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Coon Rapids Public Works 5000000 1000000 City Budget <br />and FEMA <br />Funds <br />Continued <br />Goal 3: Improve traffic flows, reduce congestion, upgrade critical bridge and infrastructure, improve emergency response times; establish plans, <br />implement plans. <br />Objective 3.1: Improve transportation system by widening US Highway 10 and replacing Hanson Boulevard interchange. <br />Action Action Project Description Jurisdiction Responsibility Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br />Status <br />3.1.1 Increase vehicle, pedestrian, and bicycle Safety. Including <br />roads, trails and bridges next to, under, or over major surface <br />streets to reduce accidents and increase safety. <br /> <br />CRB Ext. (Improved RR bridges over CRB and raise elevations <br />to allow larger response truck passage, and widen clear zone) <br />Foley Blvd railroad grade separation <br />3rd lane on TH 10 between Hanson & Round Lake Blvd TH <br />610/East River Road full access interchange <br />Coon Rapids Blvd pedestrian <br />Traffic flow improvements in and around the Riverdale area <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Coon Rapids Coon Rapids <br />Public Works, <br />Anoka Co <br />Highway, <br />MNDOT <br />63000000 90000000 City Budget, <br />BNSF <br />Funds, <br />Federal, <br />State and <br />County <br />Road funds <br />and grants <br />Continued
The URL can be used to link to this page
Your browser does not support the video tag.