My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
10/16/2019 3:45:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Anoka County 2019 <br />Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> <br /> 216 <br />Action Action/Project Description Jurisdiction Responsibility Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br /> <br />1.1.1 Soil test and Survey area to construct flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry and <br />City <br />Emergency <br />Management <br />25,000 1000000 Multi-Gov Continued <br />1.1.2 Design/Engineer a stable flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry and <br />City <br />Emergency <br />Management <br />25,000 1000000 Multi-Gov Continued <br />1.1.3 Construct flood protection base <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Private <br />Industry and <br />City <br />Emergency <br />Management <br />205,000 2000000 Multi-Gov Continued <br />Objective 1.2: Reduce the impact of neighborhood flash flooding with detention pond upgrade <br />Action Action/Project Description Jurisdiction Responsibility Estimated <br />Cost <br />Estimated <br />Benefit <br />Funding <br />Sources <br /> <br />1.2.1 Survey/design/engineer north detention pond area <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Public Works 10,000 100000 Multi-Gov Continued <br />1.2.2 Build-up berm or levee <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Public Works 20,000 100000 Multi-Gov Continued <br />1.2.3 Purchase a pump <br /> <br />Continue to improve jurisdictional capabilities to prepare for, <br />respond to, mitigate, and recover from natural and technological <br />disasters. <br />Fridley Public Works 10,000 100000 Multi-Gov Continued
The URL can be used to link to this page
Your browser does not support the video tag.