My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
08-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
10/16/2019 3:45:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/12/2019
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
565
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Anoka County 2019 <br />Multi-Jurisdictional <br />All Hazards Mitigation Plan <br /> <br /> 262 <br />5.1.1 10 Partner with community to build storm shelters. <br />3.1.4 11 Review bids and hire contractor for shelter construction. <br />3.1.5 12 Contractor builds shelters. <br />Action Priority <br />Fridley <br />Action Project Comment <br />3.1.2 1 Continue to review warning and information systems. <br />3.1.1 2 <br />Evaluate current warning and evacuation systems and <br />determine needs. <br />2.1.4 3 Train members in the use of the equipment <br />2.1.2 4 Review need for additional equipment for communicating <br />3.1.3 5 Select and install a system to fit the needs of the community. <br />2.1.3 6 <br />Exercise large-scale infectious disease standard operating <br />procedures. <br />2.1.1 7 Partner with public facilities to distribute EM information <br />1.2.3 8 Purchase a pump <br />1.4.2 9 Construction to mitigate flood hazards <br />1.4.1 10 Conduct a water study and consultation <br />1.3.3 11 Integrate flow and level data into city scada system <br />1.3.2 12 Purchase/Install equipment <br />1.3.1 13 <br />Review areas for installation of water flow and level gauges for <br />Rice Creek and SpringBrook Creek <br />4.1.1 14 Partner with community to build storm shelters. <br />1.2.4 15 Install gate valve <br />1.2.2 16 Build-up berm or levee <br />1.2.1 17 Survey/design/engineer north detention pond area <br />1.1.1 18 Soil test and Survey area to construct flood protection base <br />1.1.2 19 Design/Engineer a stable flood protection base <br />1.1.3 20 Construct flood protection base <br />Action Priority <br />Ham Lake <br />Action Project Comment <br />2.1.4 1 <br />On-going training for EMO, fire department, and City staff based <br />on EMP. <br />3.1.4 2 <br />Maintain and update disaster response database on a monthly <br />basis. <br />1.1.5 3 <br />Public Safety Director/Fire Chief will coordinate training of Ham <br />Lake Council, staff and Fire Department in all aspects of NIMS. <br />4.1.1 4 Partner with community to build storm shelters. <br />1.1.4 5 <br />Public Safety Director/Fire Chief to implement programs <br />regarding public safety, fire suppression systems, fire <br />inspections, etc. <br />Action Priority <br />Hilltop <br />Action Project Comment <br />3.1.1 1 Identify appropriate generator connections <br />1.1.1 2 Feasibility study of city-owned shelter.
The URL can be used to link to this page
Your browser does not support the video tag.