My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-09-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
09-09-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
10/16/2019 3:51:59 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/09/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Otter Lake Animal Care Center Site Performance Agreement page 2 of 10 <br />A. On-Site Work. The On-site Work shall consist of the improvements <br />described in the approved Plans, to include any approved subsequent <br />amendments, and shall be in compliance with all applicable statutes, codes <br />and ordinances of the City. The Work includes all on-site exterior <br />amenities as shown on the approved Plans and as required by the plan <br />approval, such as, but not limited to: landscaping, private driveways, <br />parking areas, sanitary sewer extension, water system extension, storm <br />drainage systems, curbing, lighting, fencing, fire lanes, sidewalks, exterior <br />building architectural design and building elements, site grading and <br />erosion control measures. <br /> <br />Such improvements shall be completed in accordance with Section IV <br />herein. <br /> <br />B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On-Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br /> <br /> Description of Improvements Estimated Costs <br /> <br />1. Lighting $14,950.00 <br />2. Fences / Screen Structures $5,400.00 <br />3. Trash Disposal Structures $8,200.00 <br />4. Curbing / Islands / Delineators $16,990.00 <br />5. Storm Drainage Systems / Sewers / Catch Basins / <br />Culverts / Swales <br />$22,200.00 <br />6. Public Trails and / or Sidewalk N/A <br />7. Private Trials and / or Sidewalk $5,700.00 <br />8. Driveway / Curb cut / Parking Lot / Fire Lane $28,200.00 <br />9. Water mains / Hydrants / Sanitary Sewers $17,700.00 <br />10. Landscaping $30,000.00 <br />11. Site Grading $11,200.00 <br />12. Erosion Control $6,100.00 <br /> Total Estimated Cost of Developer Improvements <br /> <br />$166,640.00 <br /> Security Requirement (Total * 35%) $58,324.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.