Laserfiche WebLink
<br /> Direct Bore, Inc. Site Performance Agreement page 5 of 11 <br /> Unit Fee <br />1. Sanitary Sewer Trunk Unit Fee ($1,573/unit; 2.92 units/Acre) 1 $1,573.00 <br />2. City Sewer Availability Fee ($1,471/SAC Unit) 1 $1,471.00 <br />3. Sanitary Front Footage Bisel Amendment ($52.50/LF) 80 lf $4,200.00 <br />4. Water Trunk Unit Fee ($2,259/unit; 2.92 units/Acre) 1 $2,259.00 <br />5. City Water Availability Fee ($1,421/SAC Unit) 1 $1,421.00 <br />6. Water Front Footage Bisel Amendment ($49.50/LF) 80 lf $3,960.00 <br />7. City Surface Water Management Fee N/A N/A <br /> Total Estimated (Budget) Developer Fees $14,884.00 <br /> <br />IV. RECORD DRAWINGS – Not applicable. <br /> <br />A. Upon project completion, Developer shall submit record drawings, in <br />electronic format, of all public and private infrastructure improvements, <br />including grading, sanitary sewer, water main, storm sewer facilities, and <br />roads, constructed by Developer. The as-built survey must include, but is <br />not limited to, proposed and final contours with adequate elevation shots <br />to show conformance, property irons (to be exposed in field), low floor <br />and low opening elevations, and the 100-Year High Water Level (HWL) <br />of all ponds, lakes, and wetland areas. The files shall be drawn in Anoka <br />County NAD 83 Coordinate system and provided in both AutoCAD .dwg <br />and Adobe .pdf file formats. The plans shall include accurate locations, <br />dimensions, elevations, grades, slopes and all other pertinent information <br />concerning the complete work. The Developer shall also submit certified <br />compaction testing results for the site grading operations. <br />B. A summary of the record plan attribute data for the storm sewer, water <br />main, and sanitary sewer structures and pipes shall be submitted in the <br />form of an Excel Spreadsheet as provided by the City Engineer. <br />C. No securities will be fully released until all record drawings have been <br />submitted and accepted by the City Engineer. <br />V. COMPLETION DATE. <br /> <br />The Developer shall install the required on site work by October 31, 2020. <br />If the on-site work is not completed by this time, then the Developer will <br />need to start the site and building plan approval process from the beginning. <br /> <br />VI. GUARANTEE. <br /> <br />A. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer. <br />Concurrently with the execution hereof by the Developer, the Developer