My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2019 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2019
>
11/13/2019 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 4:10:46 PM
Creation date
11/8/2019 2:48:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
11/13/2019
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j CITY OF <br />14669 Fitzgerald Avenue North, Hugo, MN55038 • (651) 762-6300 • www.ci.hugo.nnn.us <br />� FRT 14(]fi <br />July 26, 2019 <br />Michael Grochala, Community Development Director <br />City of Lino Lakes <br />600 Town Center Pkwy <br />Lino Lakes, MN 55014-1182 <br />Re: City of Lino Lakes 2040 Comprehensive Plan <br />Dear Mr. Grochala: <br />Thank you for the opportunity to review the City of Lino Lakes 2040 Comprehensive Plan, a few items were <br />identified for comment. <br />1. 801h Street. As you may know, there was effort with the 1-35W/E coalition to collaborate on <br />improvements along 1-35 in several communities and Counties. The discussions included this <br />connection and interchanges at 1-35E and I-35W. Lino Lakes participated in the coalition meetings. The <br />City is interested in cooperating with adjacent jurisdictions on creating a corridor management plan <br />that would include representatives of the 1-35 W/E coalition to further this planning effort. In addition, <br />the City supports an interchange location for 1-35E at CR-140 (80th Street). <br />2. CR-84. The Lino Lakes Transpiration Plan recommends proposed new roadway connections. <br />Specifically a new County north -south route (extension of CR-84/Otter Lake Road). It would seem that <br />this road is intended to be a County Road shared by Washington and Anoka Counties. Similar to <br />CR-140, we recommend a corridor study be initiated by Anoka and Washington Counties including <br />representatives from all cities along the corridor. <br />If you have any questions or need more information, please feel free to contact me at rjuba@ci.hugo.mn.us <br />or (651) 762-6304. <br />ncerely, <br />Rac el Juba <br />Community Development Director <br />CC: Honorable Mayor and Council <br />Bryan Bear, City Administrator <br />Mark Erichson, City Engineer <br />Kendra Lindahl, City Planner <br />Shayla Denaway, Parks Planner <br />
The URL can be used to link to this page
Your browser does not support the video tag.