Laserfiche WebLink
Estimate of Cost <br />City of Lino Lakes, Minnesota <br />Construction, Post Construction, and Materials Testing Services <br />Water Tower No, 3 and Adjacent Park Site <br />Task Geseripption <br />Estimated Hours <br />Cost <br />Project Manager <br />City Engineer <br />Project Engineer <br />Engineering <br />Technician <br />Engineering <br />Teehnielan <br />Construction <br />Observer <br />Two Parson <br />Survey Crow <br />Admin <br />Total <br />Hours <br />Greg Johnsen <br />Diana Hsn,we <br />Ashley lfrmmarbeak <br />tires Slone <br />£d YounggWsb <br />7190 <br />Xaria Pederson <br />Water.Towar Construed* n Servioot <br />1.1 Prepare and distribute construction contractsand additional sots of drawings and 0904:1cations. <br />1 <br />1 <br />, <br />4 <br />6 <br />5734.00 <br />,.. M11 Attend and conduct a pro -construction confers*. with rho Contractor, City staff, and prlvato-utlll:len <br />2 <br />1 <br />2 <br />1 <br />2 <br />1 <br />9 <br />61,24E 00 <br />1.3 Review and distribute all shop drawings submited by tno Contractor: <br />29 <br />2 <br />`.80 <br />2 <br />4 <br />108 <br />615,676.00 <br />1.4 Aew and make recommandntionfor applications for payment submitted by the Contractor. <br />8 <br />24 <br />:24 <br />54 <br />66,884.00 <br />1.5 Administer the contract and preparo modifications as necessary: <br />b5 <br />4 <br />130 <br />4 <br />203 <br />$31,262.00 <br />1.6 Make visits to thasite at intervals appropriate to the various stages of construction. <br />12. <br />.24 <br />36 <br />65,544A0 <br />1.7 Attend construction progress meetings and provide update, to the City. <br />24 <br />4 <br />24 <br />4 <br />56 <br />$9,050.00 <br />1.0 Communicate daily with the design tam the Resident Project ftepresantative IRPR), and the City, <br />05 <br />130 <br />.. <br />195 <br />530,030.00 <br />1.9 Review motor al tooting reports. <br />4 <br />4 <br />5544.00 <br />1.10 Raviaw operation and maintenones manuals:. <br />3 <br />a <br />5: <br />$698.00 <br />1.11 'Prepare and distribute eontmctpr punch lists.. <br />1 <br />4 <br />-. <br />1 <br />6' <br />S678i00 <br />1.12 Prapara constriction raeord drawings for underground utilities. <br />1 <br />6 <br />7 <br />51.042.00 .. <br />1.13 Construction observation tor water tower foundation, composite, acid to Work. <br />464 <br />464 <br />545,008.00 <br />1.14 Construction surveying and stoking. <br />16 <br />16 <br />58,136.00. <br />1.15 'Electrical Englne0dng Suboonsultent (Ea rr) <br />- <br />53,900.00 <br />Took L Total Estimated Hour,' and Fria <br />196. <br />12 <br />426 <br />-6 <br />12 <br />466 <br />f6 <br />35 <br />1169 <br />5155,341.00' <br />g. Water Tower Construed* Obsorvarfon by K1.M. <br />f65;327.00 <br />III. WaterTowar.Post Qonstructlon'Services (2•Yaar Warranty! <br />1.1. Post ¢onstru4lo' administration : <br />1` <br />4 <br />4 <br />S <br />51,322.00 <br />1.2 2-yon r warranty inspe4don by L. <br />$2,900.00: <br />Task ill. Total Estimated Hours and Fee <br />1 <br />4 <br />4 <br />9 <br />54.022.00 <br />1V_. Water'. Tower Material TestM8 SaMeoa <br />915,701.00 <br />V. Park Sha Grading Construction Observation and Sanayin <br />1.1 Construction :Observation <br />80 <br />80 <br />57,760.00 :.... <br />1.2 Con siren Stak nO <br />16 <br />16 <br />S3,136.00 <br />Task V. Total Estimated Hours and. Fos <br />60 <br />16 <br />16 <br />96 <br />-. <br />510,896.00 <br />Total Fstimated Hours <br />197 <br />12... <br />430 <br />6 <br />12 : <br />550. <br />32 <br />51 <br />1274 <br />Average Hourly Billing Sate.. <br />$190,00 <br />5164,00 <br />6136.00. <br />$151.00 <br />6144.00...... <br />697.00 <br />5196:00 <br />'S95,00 <br />Total Fee for W08 by Labor Giassideation , <br />637,430.00 <br />$1,968.00 <br />$58,460.00 <br />$006.00 <br />i <br />$1,728.00 <br />553,350.00 <br />56.272.00 <br />$4,845.00 <br />3176,760.00' <br />Total Faa for OM1 Engineering .SuboonsuMant <br />- <br />$88.227.00 <br />Total Fee for Electrical Engineadne Subconsultant Maw) <br />63.900:00 <br />TOTAL PROJECT COST <br />$270,887.00 <br />