My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-14-13 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2013
>
10-14-13 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 1:31:00 PM
Creation date
10/24/2013 10:38:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/14/2013
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6E <br />STAFF ORIGINATOR:Jason C. Wedel, City Engineer <br />MEETING DATE:May 13, 2012 <br />TOPIC:Consider ResolutionNo. 13-113Approving Change Order No. 1, <br />2013 Surface Water Management Project <br />VOTE REQUIRED:3/5 Vote Required <br />BACKGROUND <br />At the September 9, 2013meeting, City Council awarded the2013 Surface Water Management <br />Projectto C.W. Houle.Construction began in September and is nearly complete. <br />It was discussed at the City Council meeting awarding the contract that the project was projected to <br />come in significantly under budget and that staff would identify an addition project area for City <br />Council consideration. An additional project area has been identified as the ditch and culvert along <br />the north side of Birch Street from Deerwood Lane to 600 feet east. The ditch in this area needs to <br />be cleaned out and the culvert under Deerwood Lane needs to be replaced. Currently, this section <br />of trail floods each spring to the point that the City has to close it down for public use. The <br />proposed improvements are intended to alleviate this issue so that any flooding will be minimized <br />in the future. <br />The contractor for our current project has reviewed the prepared plans and presented a change order <br />in the amount of $23,950 to complete this work. Financing for this project as originally proposed is <br />still sufficient with the proposed change order. A breakdown of the construction cost is as follows: <br />OriginalContract Amount$69,988 <br />Engineering Costs$ 19,500 <br />Change Order No. 1$ 23,950 <br />Total Construction Cost$113,438 <br />Annual Budget$125,000 <br />RECOMMENDATION <br />Approve Resolution 13-113,Approving Change Order No. 1, 2013 Surface Water Management <br />Project. <br />ATTACHMENTS <br />1.Resolution No. 13-113 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.