My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2019-164 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2019
>
2019-164 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2021 10:04:14 PM
Creation date
12/27/2019 9:53:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/09/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LINO LAKES <br />RESOLUTION NO. 19-164 <br />RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS <br />FOR THE 2020 STREET REHABILITATION PROJECT <br />WHEREAS, the City Council finds that it would be in the best interest of the City to proceed with <br />the preparation of plans and specifications for street rehabilitation of: <br />Full Depth Mill and Overlay / Reclamation — Deerwood Lane from Birch Street south to <br />Fox Road, and Fox Road from Deerwood Lane west to West Shadow Lake Drive <br />Thin Overlay — Carl Street from 4th Avenue west 1,400 feet, Rehbein Street, 77th Street, <br />and Gordon Avenue. Bid Alternate* for Olive Street, Eva Street, Orange Street, and Maple <br />Street. <br />Chip Seal, Crack Fill & Striping — City Hall Parking Lot and Town Center Parkway from <br />Lake Drive to YMCA <br />Curb Repair — Town Center Parkway south curb line from Lake Drive to YMCA and east <br />entrance to City Hall parking lot; and <br />WHEREAS, WSB, the City Engineer, has submitted a proposal to prepare plans and <br />specifications. <br />NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes: <br />1. Authorizes the Preparation of the Plans and Specifications for the 2020 Street <br />Rehabilitation Project. <br />2. WSB is designated as the engineer for this improvement and directed to prepare plans <br />and specifications for the 2020 Street Rehabilitation Project for an amount not to <br />exceed $46,192.00 <br />Adopted by the Council of the City of Lino Lakes this 9th day of December, 2019. <br />The motion for the adoption of the foregoing resolution was introduced by Council Member <br />Manthey and was duly seconded by Council Member Stoesz and upon <br />vote being taken thereon, the following voted in favor thereof: <br />Manthey, Stoesz, Maher, Rafferty, Reinert <br />The following voted against same: <br />none <br />ATTEST: <br />Juli <br />e Bartell, Cjty Cler <br />Jeff Reinert, M. or <br />
The URL can be used to link to this page
Your browser does not support the video tag.