My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02-11-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
02-11-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2021 9:40:17 AM
Creation date
1/16/2020 10:06:16 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/11/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 2 — System Development <br />Core Activities Include: <br />• Develop solution in test (or production) environment <br />• Regular solution demonstrations and walkthroughs with Lino Lakes project team (PM, SMEs <br />and users as appropriate) to show progress and solicit feedback <br />• Develop test scripts to be utilized in Phase 3 — User Acceptance Testing <br />Deliverables: <br />• System deployed in test (or production) environment, ready for User Acceptance Testing. <br />• Test scripts to be utilized in Phase 3 — User Acceptance Testing* <br />Assumptions Driving Effort: <br />• OPG-3 project team members receive access to all necessary Lino Lakes resources by the <br />scheduled implementation start time in the project plan. <br />• Lino Lakes personnel will be available to provide any assistance OPG-3 may need in the Lino <br />Lakes environment. <br />• Lino Lakes personnel attending solution demonstrations and walkthroughs are empowered <br />to provide feedback that will affect overall design. <br />Phase 3 — User Acceptance Testing <br />Core Activities Include: <br />• Work with Lino Lakes to identify end users that will participate in UAT. <br />• Testing by Lino Lakes end -users using the test scripts developed in Phase 2. <br />• Remediate any issues discovered during UAT until acceptance criteria are satisfied. <br />Deliverables: <br />• Solution deployed in Test (or Production), approved by Lino Lakes for promotion to <br />Production. <br />Assumptions Driving Effort: <br />• Lino Lakes personnel will be available for UAT per a mutually agreed -upon schedule. <br />oPc-3 <br />Enterprise Transformation <br />CONFIDENTIAL I SOW — Lino Lakes — Online Permitting Solution for <br />PermitWorks I Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.