My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11-12-2019 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2019
>
11-12-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2021 1:08:48 PM
Creation date
1/16/2020 10:21:55 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/12/2019
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Erosion Control Inspection Fee (single, two-family, townhomes up to 8 units) $160.00 <br />Multi-family > 8 units, Commercial, Industrial and Institutional determined <br />by separate agreement. <br /> <br />Change of use/occupancy inspections $67.00 per trip <br />Erosion Control Re-inspection Fee $67.00 per trip <br />Inspections outside of normal business hours $67.00 per hour* <br />Re-inspection fee $67.00 per trip <br />Inspections for which no fee is specifically designed $67.00 per trip <br />Additional plan review required by changes, additions, or revisions $67.00 per hour** <br />For use of outside consultants for plan checking and inspections, or both Actual Cost*** <br />Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. 25% of the Building Permit Fee for review of similar plans (Master Plan) in a 12 month period <br />Easement Encroachment Fee County Recording Fee plus $25.00 <br />Antenna, City Owned Property $250, plus $6,000 escrow <br />Antenna, Private Property See Building Fee Table <br />Accessory Building Permit: 200 sq. ft. or under in size $67.00 <br />Accessory Building Permit: over 200 sq. ft. in size See Building Fee Table <br />Fence Permit: 6 feet or under in height $67.00 <br />Fence Permit: over 6 feet in height See Building Fee Table <br /> <br />Grading Permit $155.00 <br />Grading Permit Escrow Deposit (if not included in Dev. Contract) $300.00 <br /> <br />Roofing Permit $103.00 <br />Siding Permit $103.00 <br /> Swimming Pool Permit: In Ground $155.00 <br />Swimming Pool Permit: Above Ground $103.00 <br />Window/Door Replacement Permit $77.00 per unit (max. $155.00) <br />Retaining Wall Permit $67.00 <br />Mechanical (HVAC) permit: Gas Fireplace $67.00 (plus $32.50 for each addt’l fireplace) <br /> <br />Mechanical (HVAC) Permit: Residential (except new construction) $67.00
The URL can be used to link to this page
Your browser does not support the video tag.