My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/08/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
04/08/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:23:51 PM
Creation date
4/3/2020 1:57:11 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
04/08/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Diane Hankee <br />April 1, 2020 <br />Page 2 <br />The draintile system is not modeled and will not be included in rate control calculations or water <br />quality calculations because groundwater is not regulated. <br />During the final plat submittal review, WSB will review the storm sewer design, site discharge <br />location, emergency overflow locations, and drainage and utility easements required for the site. <br />In summary, this preliminary plat amendment appears to meet the City requirements for stormwater <br />management and will be reviewed with the final plat submittal. <br />K:\012365-000\WR\Stormwater Plan Review\012365- <br />000 MEMO PrelimPlat Amend StormwaterReview 04012020.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.