Laserfiche WebLink
Diane Hankee <br />April 1, 2020 <br />Page 2 <br />The draintile system is not modeled and will not be included in rate control calculations or water <br />quality calculations because groundwater is not regulated. <br />During the final plat submittal review, WSB will review the storm sewer design, site discharge <br />location, emergency overflow locations, and drainage and utility easements required for the site. <br />In summary, this preliminary plat amendment appears to meet the City requirements for stormwater <br />management and will be reviewed with the final plat submittal. <br />K:\012365-000\WR\Stormwater Plan Review\012365- <br />000 MEMO PrelimPlat Amend StormwaterReview 04012020.docx <br />