My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Grochala <br />April 8, 2020 <br />Page 7 <br />Review and Update of the Mitigation Plan <br />The table below provides the mitigation plan for water appropriations. These mitigation measures have been reviewed and revised as <br />needed for this AUAR Update. <br />Table 6. Water Use <br />Item No. <br />Mitigation Description <br />Update <br />13.1 <br />Monitor water usage and do not permit new development to proceed if it <br />This mitigation measure is ongoing. <br />exceeds the capacity of the water supply and distribution system. <br />13.2 <br />Construct the water supply and distribution system in accordance with <br />This mitigation measure is ongoing. <br />Minnesota Department of Health standards and with the goals, policies, <br />and recommendations set forth in the City's Comprehensive Water <br />Supply Plan. <br />13.3 <br />As necessary, amend the City's Comprehensive Water Supply Plan and <br />This mitigation measure is ongoing. No <br />Capital Improvement Plan to be consistent with any future amendments <br />updates have been needed to date for the <br />or updates to the Comprehensive Plan that would necessitate expansions <br />study area. <br />or alterations to the water system. <br />13.4 <br />Follow the adopted Wellhead Protection Plans for Lino Lakes and <br />This mitigation measure is ongoing. <br />Centerville. As necessary, amend the City's Wellhead Protection Plan for <br />new wells. <br />13.5 <br />Require abandoned private wells to be sealed in compliance with the <br />This mitigation measure is ongoing. <br />Minnesota Department of Health regulations. <br />13.6 <br />Require that the installation of any private individual wells be constructed <br />This mitigation measure is ongoing. <br />and installed in accordance with the Minnesota Department of Health <br />regulations (Minnesota Well Code). <br />13.7 <br />Continue to implement the City's adopted water conservation policies <br />This mitigation measure is ongoing. <br />which are intended to attenuate peak water demands throughout the City. <br />13.8 <br />Mitigation will be regulated through the City's development approval and <br />This mitigation measure is ongoing. <br />permitting process. Proposed master development plans, planned unit <br />development and subdivision applications, plats, and/or site plans must <br />K:\015144-000\Admin\DOCSWUAR -Update 2020\Water Wastewater\MEMO - 040820 - Water.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.