My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/29/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
04/29/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:57:26 PM
Creation date
4/24/2020 11:18:56 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
04/29/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />U <br />C0 <br />Z <br />W <br />m <br />U) <br />Z <br />U) <br />J <br />0 <br />a <br />a <br />W <br />z <br />z <br />0 <br />0 <br />M <br />W <br />U) <br />T <br />ws b <br />Final Technical Memorandum <br />To: Michael Grochala, City of Lino Lakes <br />From: Jon Christensen, WSB <br />Andi Moffatt, WSB <br />Date: April 8, 2020 <br />Re: Wastewater Management — 1-35 Corridor AUAR <br />City of Lino Lakes, Minnesota <br />WSB Project No. R-015144-000 <br />The original Alternative Urban Areawide Review (AUAR) was completed and approved in <br />September 2005. The AUAR analyzed the stormwater impacts of the three development <br />scenarios. Based on the analysis, a Mitigation Plan was developed. <br />AUAR updates are required every five years from the original date of the approved AUAR. <br />Updates were prepared in 2010 and 2015. Each assumed no change in the proposed <br />development land use scenarios and included discussion of mitigation improvements that had <br />been completed at the time. Since the 2015 AUAR update was prepared, the City has completed <br />an updated Comprehensive Plan. This AUAR Update includes review of three scenarios. <br />The information and analysis outlined within this memo is intended to complete a portion of the <br />AUAR Update related to Item # 11.b.i — Water Resources — Wastewater related to revising of the <br />three scenarios. This memo is intended to update the wastewater analysis provided in the original <br />AUAR where applicable. <br />WATER RESOURCES — WASTEWATER <br />Describe effects from project activities on water resources and measures to minimize or mitigate <br />the effects in Item b.i. through Item b.iv. below. <br />Wastewater - For each of the following, describe the sources, quantities and <br />composition of all sanitary, municipal/domestic and industrial wastewater produced or <br />treated at the site. <br />1) If the wastewater discharge is to a publicly owned treatment facility, identify <br />any pretreatment measures and the ability of the facility to handle the added <br />water and waste loadings, including any effects on, or required expansion of, <br />municipal wastewater infrastructure. <br />2) If the wastewater discharge is to a subsurface sewage treatment systems <br />(SSTS), describe the system used, the design flow, and suitability of site <br />conditions for such a system. <br />3) If the wastewater discharge is to surface water, identify the wastewater <br />treatment methods and identify discharge points and proposed effluent <br />limitations to mitigate impacts. Discuss any effects to surface or groundwater <br />from wastewater discharges. <br />KA015144-000\Admin\DOCSWUAR -Update 2020\Water Wastewater\MEMO - 040820 - Wastewater.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.