My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/27/2020 EB Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2020
>
05/27/2020 EB Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 2:50:37 PM
Creation date
5/22/2020 1:31:06 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
05/27/2020
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> <br /> <br />ENVIRONMENTAL BOARD <br />AGENDA ITEM 6A <br /> <br /> <br />STAFF ORIGINATOR: Andy Nelson, Environmental Coordinator <br /> <br />MEETING DATE: May 27th, 2020 <br /> <br />REQUEST: Conditional Use Permit for Laborer’s Training <br />Center Campus Expansion (2350 Main Street) <br /> <br />APPLICANT: Laborer’s Training Center <br /> Attn: Dean Mills <br /> 2350 Main Street <br /> Lino Lakes, MN 55038 <br /> <br />OWNER: Same <br /> <br /> <br /> <br />PROPOSED ADDITION <br /> <br />BACKGROUND <br /> <br />Laborer’s Training Center (LTC) is located at 2350 Main Street. The applicant is <br />proposing to construct a 37,284 sf training facility to the east of the existing facility. <br /> <br />The Land Use Application is for the following: <br /> <br />• Conditional Use Permit <br />o Two (2) or more buildings on the same lot <br />• Site and Building Plan Review <br />This staff report is based on a review of the following documents: <br /> <br />• Laborer’s Training Center Campus Expansion Plan Set, prepared by Barr <br />Engineering Co. dated 5/11/20 <br />• Stormwater Management Plan prepared by Barr Engineering Co. dated May 2020 <br />• Geotechnical Exploration Report prepared by Haugo Geotechnical Services dated <br />February 2020 <br />• Wetland Delineation Report prepared by Barr Engineering Co. dated August 2019 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.