My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/10/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
06/10/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 4:06:20 PM
Creation date
6/5/2020 2:52:18 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
06/10/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />06/03/2020 <br />Page 4 <br />The Stormwater Report shows the orifice outlet for OCS 1 as 4.8" and the plan shows <br />5". The OCS 1 detail on C2.14 of the final plat submittal does not match the HydroCAD <br />model or the plan sheet for the orifice, top weir, or rim elevation. Please confirm the <br />correct orifice diameter and the elevation of all three devices. <br />The Water Reuse system will be supplemented by municipal water in low conditions: <br />a. The applicant shall provide calculations demonstrating the amount of infiltration <br />provided. <br />Standard Rice Creek watershed district water reuse calculations nave been <br />provided. <br />The location of the re -use system pump and connection to city water shall be <br />shown on the utility plan with backflow prevention. <br />The mechanical engineer has been recently hired by the owner and this will be <br />addressed as soon as possible. (AJA 2020-05.08) <br />b. Provide an elevation (below the NWL) that the irrigation system will need to <br />switch to City water during dry periods. <br />The elevation has been labeled on the plan <br />The applicant shall submit their allowable pump down elevation. Please <br />identify where on the plan this is included. If a pond liner is being proposed <br />please include information on the grading plan or other. <br />Pond Liner information can be found on detail 11 on sheet C2.11. (AJA 2020- <br />05.08) <br />Confirm the allowable pump down elevation. The stormwater reuse system <br />design and details shall be submitted by June 19, 2020 for review prior to final <br />plat approval. <br />C. With the final design additional detail will be required and reviewed. <br />This is noted <br />The plan set shall show the storm sewer plan view and easement lines on the same <br />page. This will allow the City to verify all storm and utility easements are correct. <br />The plan sheets hare been modified <br />Easements will be reviewed with the final design submittal. <br />Noted. (AJA 2020-05.08) <br />The applicant shall verify the manhole sizes/storm sewer layout for: <br />a. CB 037, tight angle, consider storm sewer realignment. <br />b. CB 004, tight angle, larger structure needed. <br />C. CB 001, tight angle, larger structure needed. <br />d. CB 101, tight angle, larger structure needed. <br />e. CB 011, tight angle, larger structure needed. <br />f. CB 013, tight angle, consider storm sewer realignment. <br />g. CB 008, tight angle, larger structure needed. <br />h. Additional CB's required between CB 1 & 2 at the road bend. <br />Catch basin structures have been re -verified <br />Storm sewer systems and catch basins will be reviewed with the final design <br />submittal. Additional CB's will be required to maintain the storm sewer pipe <br />within 2 feet from the road. <br />Noted. (AJA 2020-05.08) <br />Storm sewer shall have 15 feet of separation from a structure and include a 20' <br />easement. The applicant should consider a utility and trail corridor between the private <br />road and main road. (between Lots 10-11, Lots 11-12) <br />Noted. (AJA 2020-05.08) <br />Our review is based on the assumption that the senior living complex has a finished <br />floor elevation of 910.5 and a 12 foot parking garage below. The ground water in this <br />Lyngblomsten Preliminary Plat Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.