Laserfiche WebLink
i <br />a <br />o <br />O <br />SAWCUT AND REMOVE CONCRETE <br />CURB AND GUTTER <br />PROTECT EXISTING <br />s <br />LIGHTS AND SIGNS <br />REMOVE LIGHT POLE <br />1 <br />o I <br />II <br />o rn I <br />' <br />REMOVE CATCH BASIN <br />15" MP I <br />I---\ w w w <br />1\ I REMOVE 21 LF 12" RCP <br />CONSTRUCTION <br />LIMITS, TYPICAL <br />1 <br />EXISTING CURB AND GUTTER, <br />PROTECT ' <br />PROTECT EXISTING CONCRETE <br />CURB AND GUTTER <br />SAWCUT AND REMOVE CONCRETE <br />CURB AND GUTTER <br />REMOVE AND DISPOSE OF <br />CONCRETEAPRON <br />REMOVE CATCH 7 <br />BASFCASTIN <br />/ / <br />INLET PROTECTION <br />SEE <br />j 01 <br />I <br />MAIN STREET <br />r ROCK CONSTRUCTION ENTRANCE <br />SEE \------_ <br />920 <br />\ \ I S SAWCUT AND REMOVE CONCRETE <br />\ 8 I CURB AND GUTTER <br />SILT FENCE, TYP. \ \ <br />____ ____ ____ sI SEE 1 <br />REMOVE LIGHT POLES (2) \ \ <br />\ 4 <br />% U\ \ II I <br />S PROTECT EXISTING <br />/ WETLAND <br />/ J I SAWCUT AND REMOVE CONCRETE ` <br />jl CURB AND GUTTER yy' <br />REMOVE LIGHT POLE wC TREE PROTECTION FENCE, <br />/ TYP., SEE \ \ \ I I 1\ 1 <br />SAWCUT AND REMOVE CONCRETE /� <br />_ WALKWAY TO NEAREST JOINT � PROTECT EXISTING TREES, \ \1 O <br />TYP. <br />PROTECT EXISTING <br />\ * 18-,M WALLSTRUCTURE <br />\ 2-u'�m, <br />EXISTING CURB AND GUTTER, �� p <br />NOT TO BE REMOVED \\m \ \\\\ I <br />l i 20 "W A "�� o ' 1 \ y <br />/ LABORER'S \ �� \ I P� �s( ,CONSTRUCTION <br />TRAINING\LIMITS,NPICAL <br />CENTER �ti° REMOVEV <br />BITUMINOUS \�� PLI 1 > 1 91 SAWCUTANDREMOVE <br />1 ,I <br />• - - • ®®.� 1 �I1 I�1�.�1 III III. <br />w' puiu5u5ii iWOu�i V ��i�y�� <br />SAWCUT•REMOVE• -c•- ®•i� • 1 <br />k 4.�,I® <br />1 I <br />vv I <br />91 <br />1 �4 <br />/ 4 b I <br />/ 1 / <br />A <br />�, REMOVE 48 LF SAWC <br />REMOVE 18" RCP <br />CONCRETE <br />LIGHT POLE <br />� / NEAREST JOINT <br />INLET PROTECTION _ i / / N; 'o? <br />SEE ,2 I \—_------- /s s 'c Nx U /,II/, SIG IG IG (✓ <br />4" L _ <br />��ii <br />1 , <br />i --- ®— �� , 'I z zllz I it <br />REMOVE FLARED /' / O <br />REMOVE CURB / ��� END SECTION M PINE // REMOVE EXISTING REMOVE <br />AND GUTTER I / GRAVEL CONCRETE „ <br />AND STORAGE \ Z / I Z <br />-ASH I I ', 8"PIKE // CONTAINERS. \\ '/, '/, '/. '/, I'/, <br />CLEAR AND GRUB 1/ / COORDINATE <br />AT EXIST. POND III ASH /, / ,5" INE / / WITH OWNER \ I , <br />/ <br />/"PINE v %I% — <br />I -REMOVE EXISTING <br />LIGHT POLE g L \� , un/ /j / / EASEMENT LIMITS CLEAR AND GRUB <br />� ^PINE o AREA (APPROX.) f6 " <br />6"ASH V %I%II <br />REMOVE CONCRETE <br />SILT FENCE, SEE <br />�„Se-2 I N z zll� zlz REMOVE 45 LF 12" RCP <br />I CLEAR AND GRUB X —� REMOVE 67 LF 12"RCP�w,.\\� <br />I AREA (APPROX.) —�II� / SB-4\ I — \ \ �/ / / 'XI / \ <br />,PROTECT EXISTING <br />TREES, TYP. % GIGI iJ/'I GIG <br />__-9/6 ZIBGI <br />918 REMOVE FLARED <br />REMOVE EXISTING <br />END SECTION p I <br />I, <br />zzzzzzzzzzz is' zzzzz ziilzlz l \ y � � � FLARED END SECTION \ I I �% \ <br />PROTECT EXISTING I <br />\ 1 <br />'/. Z '/, '/. '/, '/. '/. '/, '/, % '/. %� �'/, '/, '/, '/. '/,�: y TREES, TYP. 6 \ O <br />TheBiiiiiii m +� D01 \ \ SB-3 \ iilliti 1 <br />- TREE PROTECTION _ 6 /REMOVE FLARED �� 1 \ \\ \ \\ O 11 <br />FENCE, TYP., SEE D-01 , / / / /�/ END SECTION / >>\ PROTECT EXISTING \ \\ \. \ - <br />✓.1L_'L_%LL_;! - WETLAND \ \ \ - ----. <br />MATCH LINE-SHEETG-O5 -- - ------------ - �_� �`__ —__� _ <br />a — L � <br />' zzizzzzzzzzzz/zzzJ'zzl z \ i�� 1 zlzl�iz�ri, 11 <br />1 PLAN: EXISTING CONDITIONS, REMOVAL, AND EROSION CONTROL - NORTH <br />0 40 80 O <br />SCALE N FEET <br />LEGEND <br />920 <br />EXISTING 10' CONTOUR <br />- — — -918- — — <br />- EXISTING 2' CONTOUR <br />ss ss <br />EXISTING STORM SEWER <br />EXISTING SANITARY SEWER <br />�s �s <br />EXISTING GAS LINE <br />w w <br />EXISTING WATER MAIN <br />^^ w* <br />EXISTING WETLAND <br />of of <br />EXISTING OVERHEAD ELECTRIC <br />E E <br />EXISTING UNDERGROUND ELECTRIC <br />EXISTING BURIED CABLE LINE <br />EXISTING TREE TO PROTECT <br />EXISTING TREE FOR REMOVAL <br />EXISTING SHRUB TO PROTECT <br />EXISTING SHRUB FOR REMOVAL <br />------- <br />PROPERTY LINE <br />— — — <br />CONSTRUCTION LIMITS <br />0 <br />SILT FENCE <br />TREE PROTECTION FENCE <br />x <br />( SEE DETAIL 6/D-01 ) <br />CONSTRUCTION ENTRANCE <br />EXISTING BITUMINOUS, MILL TO <br />FULL PAVEMENT THICKNESS <br />CLEARING AND GRUBBING LIMITS, <br />APPROX. <br />SB-1 <br />APPROXIMATE SOIL <br />BORING LOCATIONS <br />EROSION & SEDIMENT CONTROL NOTES: <br />1. INSTALL PERIMETER EROSION CONTROL AT THE LOCATIONS SHOWN ON THE PLANS PRIOR TO <br />THE COMMENCEMENT OF ANY LAND DISTURBANCE OR CONSTRUCTION ACTIVITIES. <br />2. BEFORE BEGINNING CONSTRUCTION, INSTALL A TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />AT EACH POINT WHERE VEHICLES EXIT THE CONSTRUCTION SITE PRIOR TO COMMENCING ANY <br />CLEARING/GRUBBING, REMOVAL, OR EARTHWORK ACTIVITIES. USE 2 INCH OR GREATER <br />DIAMETER ROCK IN A LAVER AT LEAST 6 INCHES THICK ACROSS THE ENTIRE WIDTH OF THE <br />ENTRANCE. EXTEND THE ROCK ENTRANCE AT LEAST 50 FEET INTO THE CONSTRUCTION ZONE <br />USING A GEO-TEXTILE FABRIC BENEATH THE AGGREGATE TO PREVENT MIGRATION OF SOIL INTO <br />THE ROCK FROM BELOW. <br />3. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND <br />PRIVATE PAVEMENT AREAS. AT A MINIMUM REMOVAL SHALL BE ONCE DAILY. SWEEPING SHALL <br />BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION AND DONE IN A MANNER <br />TO PREVENT DUST BEING BLOWN TO ADJACENT PROPERTIES. <br />4. INSTALL INLET PROTECTION AT ALL PUBLIC AND PRIVATE CATCH BASIN INLETS WHICH RECEIVE <br />RUNOFF FROM THE DISTURBED AREAS. CONTRACTOR SHALL CLEAN, REMOVE SEDIMENT, OR <br />REPLACE STORM DRAIN INLET PROTECTION DEVICES ON A ROUTINE BASIS SUCH THAT THE <br />DEVICES ARE FULLY FUNCTIONAL FOR THE NEXT RAIN EVENT. SEDIMENT DEPOSITED IN AND/OR <br />PLUGGING DRAINAGE SYSTEMS IS THE RESPONSIBILITY OF THE CONTRACTOR. HAY BALES OR <br />FILTER FABRIC WRAPPED GRATES ARE NOT ALLOWED FOR INLET PROTECTION. <br />5. LOCATE SOIL OR DIRT STOCKPILES NO LESS THAIN 25 FEET FROM ANY PUBLIC OR PRIVATE <br />ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE <br />STOCKPILES BY MULCHING, VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION <br />FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. <br />6. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE <br />CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND <br />SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR <br />ROTTED EROSION CONTROL DEVICES IMMEDIATELY. <br />7. TEMPORARILY OR PERMANENTLY STABILIZE ALL CONSTRUCTION AREAS WHICH HAVE <br />UNDERGONE FINAL GRADING, AND ALL AREAS IN WHICH GRADING OR SITE BUILDING <br />CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, <br />WIND AND RUNNING WATER. STABILIZATION TO BEGIN IMMEDIATELY AND BE COMPLETED WITHIN <br />14 DAYS. USE SEED AND MULCH, EROSION CONTROL MATTIING, AND/OR SODDING AND STAKING <br />IN GREEN SPACE AREAS. REMOVE ALL TEMPORARY SYNTHETIC, STRUCTURAL, <br />NON -BIODEGRADABLE EROSION AND SEDIMENT CONTROL DEVICES AFTER THE SITE HAS <br />UNDERGONE FINAL STABILIZATION WITH PERMANENT VEGETATION ESTABLISHMENT. FINAL <br />STABILIZATION FOR PURPOSES OF THIS REMOVAL IS 70 % ESTABLISHED COVER OVER DENUDED <br />AREA. <br />8. CHANGES TO APPROVED EROSION CONTROL PLAN MUST BE APPROVED BY THE ENGINEER <br />PRIOR TO IMPLEMENTATION. CONTRACTOR TO PROVIDE INSTALLATION AND DETAILS FOR ALL <br />PROPOSED ALTERNATE TYPE DEVICES. <br />9. IF DEWATERING OR PUMPING OF WATER IS NECESSARY, THE CONTRACTOR IS RESPONSIBLE FOR <br />OBTAINING ANY NECESSARY PERMITS AND/OR APPROVALS PRIOR TO DISCHARGE OF ANY <br />WATER FROM THE SITE. IF THE DISCHARGE FROM THE DEWATERING OR PUMPING PROCESS IS <br />TURBID OR CONTAINS SEDIMENT LADEN WATER, IT MUST BE TREATED THROUGH THE USE OF <br />SEDIMENT TRAPS, VEGETATIVE FILTER STRIPS, OR OTHER SEDIMENT REDUCING MEASURES <br />SUCH THAT THE DISCHARGE IS NOT VISIBLY DIFFERENT FROM THE RECEIVING WATER. <br />ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AT THE DISCHARGE POINT TO <br />PREVENT SCOUR EROSION. <br />10. INSTALL SEED, EROSION CONTROL BLANKET, MULCH, AND OTHER REVETMENT IN ACCORDANCE <br />WITH DESIGN DRAWING SHEETS D-01, R-01, R-02, R-03, R-04, R-05, AND R-06. <br />11. BOTH CONTRACTOR AND ENGINEER SHALL KEEP A LOG OF ALL TREES GREATER THAN 6" <br />DIAMETER AT BREAST HEIGHT REMOVED DURING CONSTRUCTION. SEE SHEET R-04 FOR TREE <br />REPLACEMENT REQUIREMENTS. <br />ISSUED FOR PERMITTING <br />NOT FOR CONSTRUCTION <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR <br />REPORT WAS PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY LICENSED <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE <br />STATE OF MINNESOTA. <br />CLIENT <br />BPmj.dof'. <br />ARB ENGINEERING CO. <br />BARR 4300 MARKETPOINTE DRIVE <br />Suite 200 <br />MINNEAPOLIS, MN 55435 <br />Coryospo,Headquarters: Ph:1-800-632-2277 <br />Minneapolis, Minnesota Fax: (952)832-2601 <br />Ph:1-800-632-2277 wwwbarr.com <br />S.I. <br />ASSHOWN <br />TRAINING CENTER <br />LINO LAKES, MN <br />LTC CAMPUS EXPANSION <br />LINO LAKES, MN <br />BARR PROJECT No. <br />23/02-1079.00 <br />BID <br />Date <br />OS/11/2020 <br />CONSTRUCTION <br />PERMITTING <br />05/11120 <br />— <br />DrawnLABORERS <br />EPF <br />CLIENT PROJECT No. <br />PRINTED NAME MICHELLE KIMBLE <br />Checked <br />MAK <br />EXISTING CONDITIONS, REMOVALS, AND <br />EROSION CONTROL PLAN -NORTH <br />SIGNATURE <br />RELEASED <br />TO/FOR <br />A <br />B <br />C <br />0 <br />1 <br />2 <br />3 <br />Designed <br />BARR <br />DWG. No. <br />G-04 <br />REV. No. <br />A <br />NO. <br />BY <br />CHK. <br />APP. <br />DATE <br />REVISION DESCRIPTION <br />DATE o51111202D LICENSE a 42012 <br />DATE RELEASED <br />Approved <br />MAK <br />