i
<br />a
<br />o
<br />O
<br />SAWCUT AND REMOVE CONCRETE
<br />CURB AND GUTTER
<br />PROTECT EXISTING
<br />s
<br />LIGHTS AND SIGNS
<br />REMOVE LIGHT POLE
<br />1
<br />o I
<br />II
<br />o rn I
<br />'
<br />REMOVE CATCH BASIN
<br />15" MP I
<br />I---\ w w w
<br />1\ I REMOVE 21 LF 12" RCP
<br />CONSTRUCTION
<br />LIMITS, TYPICAL
<br />1
<br />EXISTING CURB AND GUTTER,
<br />PROTECT '
<br />PROTECT EXISTING CONCRETE
<br />CURB AND GUTTER
<br />SAWCUT AND REMOVE CONCRETE
<br />CURB AND GUTTER
<br />REMOVE AND DISPOSE OF
<br />CONCRETEAPRON
<br />REMOVE CATCH 7
<br />BASFCASTIN
<br />/ /
<br />INLET PROTECTION
<br />SEE
<br />j 01
<br />I
<br />MAIN STREET
<br />r ROCK CONSTRUCTION ENTRANCE
<br />SEE \------_
<br />920
<br />\ \ I S SAWCUT AND REMOVE CONCRETE
<br />\ 8 I CURB AND GUTTER
<br />SILT FENCE, TYP. \ \
<br />____ ____ ____ sI SEE 1
<br />REMOVE LIGHT POLES (2) \ \
<br />\ 4
<br />% U\ \ II I
<br />S PROTECT EXISTING
<br />/ WETLAND
<br />/ J I SAWCUT AND REMOVE CONCRETE `
<br />jl CURB AND GUTTER yy'
<br />REMOVE LIGHT POLE wC TREE PROTECTION FENCE,
<br />/ TYP., SEE \ \ \ I I 1\ 1
<br />SAWCUT AND REMOVE CONCRETE /�
<br />_ WALKWAY TO NEAREST JOINT � PROTECT EXISTING TREES, \ \1 O
<br />TYP.
<br />PROTECT EXISTING
<br />\ * 18-,M WALLSTRUCTURE
<br />\ 2-u'�m,
<br />EXISTING CURB AND GUTTER, �� p
<br />NOT TO BE REMOVED \\m \ \\\\ I
<br />l i 20 "W A "�� o ' 1 \ y
<br />/ LABORER'S \ �� \ I P� �s( ,CONSTRUCTION
<br />TRAINING\LIMITS,NPICAL
<br />CENTER �ti° REMOVEV
<br />BITUMINOUS \�� PLI 1 > 1 91 SAWCUTANDREMOVE
<br />1 ,I
<br />• - - • ®®.� 1 �I1 I�1�.�1 III III.
<br />w' puiu5u5ii iWOu�i V ��i�y��
<br />SAWCUT•REMOVE• -c•- ®•i� • 1
<br />k 4.�,I®
<br />1 I
<br />vv I
<br />91
<br />1 �4
<br />/ 4 b I
<br />/ 1 /
<br />A
<br />�, REMOVE 48 LF SAWC
<br />REMOVE 18" RCP
<br />CONCRETE
<br />LIGHT POLE
<br />� / NEAREST JOINT
<br />INLET PROTECTION _ i / / N; 'o?
<br />SEE ,2 I \—_------- /s s 'c Nx U /,II/, SIG IG IG (✓
<br />4" L _
<br />��ii
<br />1 ,
<br />i --- ®— �� , 'I z zllz I it
<br />REMOVE FLARED /' / O
<br />REMOVE CURB / ��� END SECTION M PINE // REMOVE EXISTING REMOVE
<br />AND GUTTER I / GRAVEL CONCRETE „
<br />AND STORAGE \ Z / I Z
<br />-ASH I I ', 8"PIKE // CONTAINERS. \\ '/, '/, '/. '/, I'/,
<br />CLEAR AND GRUB 1/ / COORDINATE
<br />AT EXIST. POND III ASH /, / ,5" INE / / WITH OWNER \ I ,
<br />/
<br />/"PINE v %I% —
<br />I -REMOVE EXISTING
<br />LIGHT POLE g L \� , un/ /j / / EASEMENT LIMITS CLEAR AND GRUB
<br />� ^PINE o AREA (APPROX.) f6 "
<br />6"ASH V %I%II
<br />REMOVE CONCRETE
<br />SILT FENCE, SEE
<br />�„Se-2 I N z zll� zlz REMOVE 45 LF 12" RCP
<br />I CLEAR AND GRUB X —� REMOVE 67 LF 12"RCP�w,.\\�
<br />I AREA (APPROX.) —�II� / SB-4\ I — \ \ �/ / / 'XI / \
<br />,PROTECT EXISTING
<br />TREES, TYP. % GIGI iJ/'I GIG
<br />__-9/6 ZIBGI
<br />918 REMOVE FLARED
<br />REMOVE EXISTING
<br />END SECTION p I
<br />I,
<br />zzzzzzzzzzz is' zzzzz ziilzlz l \ y � � � FLARED END SECTION \ I I �% \
<br />PROTECT EXISTING I
<br />\ 1
<br />'/. Z '/, '/. '/, '/. '/. '/, '/, % '/. %� �'/, '/, '/, '/. '/,�: y TREES, TYP. 6 \ O
<br />TheBiiiiiii m +� D01 \ \ SB-3 \ iilliti 1
<br />- TREE PROTECTION _ 6 /REMOVE FLARED �� 1 \ \\ \ \\ O 11
<br />FENCE, TYP., SEE D-01 , / / / /�/ END SECTION / >>\ PROTECT EXISTING \ \\ \. \ -
<br />✓.1L_'L_%LL_;! - WETLAND \ \ \ - ----.
<br />MATCH LINE-SHEETG-O5 -- - ------------ - �_� �`__ —__� _
<br />a — L �
<br />' zzizzzzzzzzzz/zzzJ'zzl z \ i�� 1 zlzl�iz�ri, 11
<br />1 PLAN: EXISTING CONDITIONS, REMOVAL, AND EROSION CONTROL - NORTH
<br />0 40 80 O
<br />SCALE N FEET
<br />LEGEND
<br />920
<br />EXISTING 10' CONTOUR
<br />- — — -918- — —
<br />- EXISTING 2' CONTOUR
<br />ss ss
<br />EXISTING STORM SEWER
<br />EXISTING SANITARY SEWER
<br />�s �s
<br />EXISTING GAS LINE
<br />w w
<br />EXISTING WATER MAIN
<br />^^ w*
<br />EXISTING WETLAND
<br />of of
<br />EXISTING OVERHEAD ELECTRIC
<br />E E
<br />EXISTING UNDERGROUND ELECTRIC
<br />EXISTING BURIED CABLE LINE
<br />EXISTING TREE TO PROTECT
<br />EXISTING TREE FOR REMOVAL
<br />EXISTING SHRUB TO PROTECT
<br />EXISTING SHRUB FOR REMOVAL
<br />-------
<br />PROPERTY LINE
<br />— — —
<br />CONSTRUCTION LIMITS
<br />0
<br />SILT FENCE
<br />TREE PROTECTION FENCE
<br />x
<br />( SEE DETAIL 6/D-01 )
<br />CONSTRUCTION ENTRANCE
<br />EXISTING BITUMINOUS, MILL TO
<br />FULL PAVEMENT THICKNESS
<br />CLEARING AND GRUBBING LIMITS,
<br />APPROX.
<br />SB-1
<br />APPROXIMATE SOIL
<br />BORING LOCATIONS
<br />EROSION & SEDIMENT CONTROL NOTES:
<br />1. INSTALL PERIMETER EROSION CONTROL AT THE LOCATIONS SHOWN ON THE PLANS PRIOR TO
<br />THE COMMENCEMENT OF ANY LAND DISTURBANCE OR CONSTRUCTION ACTIVITIES.
<br />2. BEFORE BEGINNING CONSTRUCTION, INSTALL A TEMPORARY ROCK CONSTRUCTION ENTRANCE
<br />AT EACH POINT WHERE VEHICLES EXIT THE CONSTRUCTION SITE PRIOR TO COMMENCING ANY
<br />CLEARING/GRUBBING, REMOVAL, OR EARTHWORK ACTIVITIES. USE 2 INCH OR GREATER
<br />DIAMETER ROCK IN A LAVER AT LEAST 6 INCHES THICK ACROSS THE ENTIRE WIDTH OF THE
<br />ENTRANCE. EXTEND THE ROCK ENTRANCE AT LEAST 50 FEET INTO THE CONSTRUCTION ZONE
<br />USING A GEO-TEXTILE FABRIC BENEATH THE AGGREGATE TO PREVENT MIGRATION OF SOIL INTO
<br />THE ROCK FROM BELOW.
<br />3. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND
<br />PRIVATE PAVEMENT AREAS. AT A MINIMUM REMOVAL SHALL BE ONCE DAILY. SWEEPING SHALL
<br />BE MAINTAINED THROUGHOUT THE DURATION OF THE CONSTRUCTION AND DONE IN A MANNER
<br />TO PREVENT DUST BEING BLOWN TO ADJACENT PROPERTIES.
<br />4. INSTALL INLET PROTECTION AT ALL PUBLIC AND PRIVATE CATCH BASIN INLETS WHICH RECEIVE
<br />RUNOFF FROM THE DISTURBED AREAS. CONTRACTOR SHALL CLEAN, REMOVE SEDIMENT, OR
<br />REPLACE STORM DRAIN INLET PROTECTION DEVICES ON A ROUTINE BASIS SUCH THAT THE
<br />DEVICES ARE FULLY FUNCTIONAL FOR THE NEXT RAIN EVENT. SEDIMENT DEPOSITED IN AND/OR
<br />PLUGGING DRAINAGE SYSTEMS IS THE RESPONSIBILITY OF THE CONTRACTOR. HAY BALES OR
<br />FILTER FABRIC WRAPPED GRATES ARE NOT ALLOWED FOR INLET PROTECTION.
<br />5. LOCATE SOIL OR DIRT STOCKPILES NO LESS THAIN 25 FEET FROM ANY PUBLIC OR PRIVATE
<br />ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE
<br />STOCKPILES BY MULCHING, VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION
<br />FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES.
<br />6. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE
<br />CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND
<br />SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR
<br />ROTTED EROSION CONTROL DEVICES IMMEDIATELY.
<br />7. TEMPORARILY OR PERMANENTLY STABILIZE ALL CONSTRUCTION AREAS WHICH HAVE
<br />UNDERGONE FINAL GRADING, AND ALL AREAS IN WHICH GRADING OR SITE BUILDING
<br />CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN,
<br />WIND AND RUNNING WATER. STABILIZATION TO BEGIN IMMEDIATELY AND BE COMPLETED WITHIN
<br />14 DAYS. USE SEED AND MULCH, EROSION CONTROL MATTIING, AND/OR SODDING AND STAKING
<br />IN GREEN SPACE AREAS. REMOVE ALL TEMPORARY SYNTHETIC, STRUCTURAL,
<br />NON -BIODEGRADABLE EROSION AND SEDIMENT CONTROL DEVICES AFTER THE SITE HAS
<br />UNDERGONE FINAL STABILIZATION WITH PERMANENT VEGETATION ESTABLISHMENT. FINAL
<br />STABILIZATION FOR PURPOSES OF THIS REMOVAL IS 70 % ESTABLISHED COVER OVER DENUDED
<br />AREA.
<br />8. CHANGES TO APPROVED EROSION CONTROL PLAN MUST BE APPROVED BY THE ENGINEER
<br />PRIOR TO IMPLEMENTATION. CONTRACTOR TO PROVIDE INSTALLATION AND DETAILS FOR ALL
<br />PROPOSED ALTERNATE TYPE DEVICES.
<br />9. IF DEWATERING OR PUMPING OF WATER IS NECESSARY, THE CONTRACTOR IS RESPONSIBLE FOR
<br />OBTAINING ANY NECESSARY PERMITS AND/OR APPROVALS PRIOR TO DISCHARGE OF ANY
<br />WATER FROM THE SITE. IF THE DISCHARGE FROM THE DEWATERING OR PUMPING PROCESS IS
<br />TURBID OR CONTAINS SEDIMENT LADEN WATER, IT MUST BE TREATED THROUGH THE USE OF
<br />SEDIMENT TRAPS, VEGETATIVE FILTER STRIPS, OR OTHER SEDIMENT REDUCING MEASURES
<br />SUCH THAT THE DISCHARGE IS NOT VISIBLY DIFFERENT FROM THE RECEIVING WATER.
<br />ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AT THE DISCHARGE POINT TO
<br />PREVENT SCOUR EROSION.
<br />10. INSTALL SEED, EROSION CONTROL BLANKET, MULCH, AND OTHER REVETMENT IN ACCORDANCE
<br />WITH DESIGN DRAWING SHEETS D-01, R-01, R-02, R-03, R-04, R-05, AND R-06.
<br />11. BOTH CONTRACTOR AND ENGINEER SHALL KEEP A LOG OF ALL TREES GREATER THAN 6"
<br />DIAMETER AT BREAST HEIGHT REMOVED DURING CONSTRUCTION. SEE SHEET R-04 FOR TREE
<br />REPLACEMENT REQUIREMENTS.
<br />ISSUED FOR PERMITTING
<br />NOT FOR CONSTRUCTION
<br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR
<br />REPORT WAS PREPARED BY ME OR UNDER MY DIRECT
<br />SUPERVISION AND THAT I AM A DULY LICENSED
<br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE
<br />STATE OF MINNESOTA.
<br />CLIENT
<br />BPmj.dof'.
<br />ARB ENGINEERING CO.
<br />BARR 4300 MARKETPOINTE DRIVE
<br />Suite 200
<br />MINNEAPOLIS, MN 55435
<br />Coryospo,Headquarters: Ph:1-800-632-2277
<br />Minneapolis, Minnesota Fax: (952)832-2601
<br />Ph:1-800-632-2277 wwwbarr.com
<br />S.I.
<br />ASSHOWN
<br />TRAINING CENTER
<br />LINO LAKES, MN
<br />LTC CAMPUS EXPANSION
<br />LINO LAKES, MN
<br />BARR PROJECT No.
<br />23/02-1079.00
<br />BID
<br />Date
<br />OS/11/2020
<br />CONSTRUCTION
<br />PERMITTING
<br />05/11120
<br />—
<br />DrawnLABORERS
<br />EPF
<br />CLIENT PROJECT No.
<br />PRINTED NAME MICHELLE KIMBLE
<br />Checked
<br />MAK
<br />EXISTING CONDITIONS, REMOVALS, AND
<br />EROSION CONTROL PLAN -NORTH
<br />SIGNATURE
<br />RELEASED
<br />TO/FOR
<br />A
<br />B
<br />C
<br />0
<br />1
<br />2
<br />3
<br />Designed
<br />BARR
<br />DWG. No.
<br />G-04
<br />REV. No.
<br />A
<br />NO.
<br />BY
<br />CHK.
<br />APP.
<br />DATE
<br />REVISION DESCRIPTION
<br />DATE o51111202D LICENSE a 42012
<br />DATE RELEASED
<br />Approved
<br />MAK
<br />
|