Laserfiche WebLink
E <br />LIGHT FIXTURE SCHEDULE <br />TYPE A _�THON:A <br />KAD LED 60C 530 40K R3 MVOLT SPD12 (2 FIXTURES AT 180 DEGREES) <br />L THON A <br />SSA 25 61 DM28 VD <br />TYPE B _�THON:A <br />KAD LED 60C 530 40K IRS MVOLT SPD12 <br />L THON A <br />SSA 25 6J DM1 9 VD <br />TYPE C L!THON:A <br />KAD LED 40C 530 40K R3 MVOLT SPD12 HS <br />L THON A <br />SSA 25 6J DMj 9 VD <br />NOTES: <br />1 ALL FIXTURES MOUNTED ON 25-FOOT TALL POLES. <br />2� SEE DETAIL 1/12-02 FOR POLE BASE INSTALLATION. <br />FOOTCANDLE STATISTICS <br />AREA <br />AVG <br />MAX <br />MIN <br />MAXIMIN <br />AVG/MIN <br />ACCESS ROAD <br />0.9 FC <br />1.9 FC <br />0.1 FC <br />19.0 <br />9.0 <br />EAST PROPERTY <br />LINE <br />0.0 FC <br />0.7 PC <br />0.0 FC <br />N/A <br />N/A <br />NORTH PROPERTY <br />LINE <br />0.2 FC <br />0.9 PC <br />0.0 FC <br />N/A <br />N/A <br />PARKING LOT <br />1.2 FC <br />3.7 FC <br />0.4 FC <br />9.3 <br />3.0 <br />SOUTH PROPERTY <br />NE <br />0.0 FC <br />0.0 PC <br />0.0 FC <br />NIA <br />N/A <br />WEST PROPERTY <br />LINE <br />0.2 FC <br />0.4 FC <br />0.0 FC <br />N/A <br />N/A <br />TYPE LIGHT FIXTURE <br />J-11 1 1: L Li 1 :1 J ol I is 1: L L lll:oI I I I- t. I " j J L I.- I,- I J I I <br />1­11"ll. '71 1 1, <br />LIGHT FIXTURE <br />TYPE'B'LIGHT FIXTURE <br />FIELD CONFIRM ORIGIN OF <br />EXISTING EXTERIOR LIGHTING <br />TYPE'B'LIGHT FIXTURE <br />CIRCUIT, VERIFY CAPACITY. <br />A <br />RE -USE FOR NEW CIRCUIT <br />208V SINGLE PHASE ASSUMED <br />IF NOT, CONTACT ENGINEER. <br />oil 1. 1. <br />0 <br />.A <br />TYPEW LIGHT FIXTURE <br />EXISTING <br />- I I , <br />C <br />z <br />BUILDING <br />TYPE'B'LIGHT FIXTURE <br />/0- <br />z <br />Q) <br />TYPE'B'LIGHT FIXTURE <br />2#10, 1#10G IN 1" PVC <br />TYPICAL THROUGHOUT <br />as as <br />7 7 7 7 77=7 7,—, 77-- 7 �77 7. 7. 7,7,77=7 7,—, 77=7 7 •7 �77 7 7, —77 7,7, 1-1, 1, 7,7� <br />le TYPE'B'LIGHT FIXTURE <br />PLAN- PHOTOMETRIC 0 50 1000 <br />SCALE IN FEET <br />ISSUED FOR PERMITTING <br />NOT FOR CONSTRUCTION <br />...... REPORT WAS PREPAREDBYMEO DIRECT <br />UNDER SUPERVISION AND THAT I AMA DULY LICENSED <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE <br />STATE OF MINNESOTA. <br />11_11N I <br />BID <br />— <br />— <br />— <br />— <br />— <br />— <br />Pmject Office. <br />BARR ENGINEERING CO. <br />4300 MARKETPOINTE DRIVE <br />BARR Suite 200 <br />MINNEAPOLIS, MN 55435 <br />orpomte Headquarters: Ph: 1-800-632-2277 <br />Minneapolis, Minnesota Fax: (952) 832-2601 <br />Ph: 1-800-632-2277 —bar— <br />.. I. <br />Dale <br />As <br />05/1112020 <br />'BORERS TRAINING CENTER <br />L/ At5k <br />LINO LAKES, MIN <br />LTC CAMPUS EXPANSION <br />LINO LAKES, MN <br />­R ­Uill I NO. <br />23/02- 079.00 <br />CONSTRUCTION <br />7ERMITTING <br />— <br />S11/2�0 <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />— <br />D.— <br />CAF <br />CLIENT PROJECT No. <br />PRINTED NAME <br />Checked <br />MEZ <br />PHOTOMETRIC PLAN <br />P7 <br />CAF <br />MEZ <br />C <br />05/111202C <br />ISSUED FOR PERMITTING, NOT FOR CONSTRUETION <br />SIGNATURE . . . . <br />RELEASED <br />TO/FOR <br />D.eign" <br />BARR <br />DWG. No. <br />E-01 <br />REV- No. <br />A <br />No. <br />BY <br />CHK. <br />DATE <br />REVISION DESCRIPTION <br />DATE LCENFE # <br />DATE RELEASED <br />Approved <br />MEZ <br />