My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/08/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
07/08/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:50:09 PM
Creation date
7/2/2020 11:16:31 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/08/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wetlands <br />Kjolhaug Environmental Services Company, Inc. prepared a Wetland Delineation Report <br />dated October 29, 2019. A Notice of Decision was issued by RCWD on December 11, <br />2019. <br />Kjolhaug Environmental Services Company, Inc. prepared a Wetland Permit Application <br />dated December 23, 2019. Per the report, two (2) wetlands were delineated on site <br />totaling 1.37 acres. Wetland 1 is a Type 1 wet meadow wetland. Wetland 2 is a partially - <br />drained, wet meadow and scrub -shrub wetland. A portion of Wetland 2 southwest of the <br />septic mound discharge outlet was created in upland and is incidental. <br />The proposed project will require 30,826 square feet (sf) (0.7076 acre) of permanent <br />impact to four (4) wetland areas, one of which is incidental for WCA permitting. <br />Replacement will be accomplished via the purchase of wetland banking credits. <br />The site is inside of the boundaries of the Lino Lakes Comprehensive Wetland Protection <br />and Management Plan (CWPMP) area; however, onsite wetlands do not fall within the <br />landscape scale/preliminary Wetland Management Corridor (WMC). Therefore, no <br />WMC buffer on wetlands is required with site development. <br />Rare & Endangered Species <br />Per the December 12, 2019 report prepared by Midwest Natural Resources, no habitats for <br />state -listed plant species were observed during field review. No further surveys are <br />recommended. <br />Floodplain <br />There is no FEMA floodplain on site. <br />2030 Comprehensive Plan <br />At the time of this staff report, the draft 2040 Comprehensive Plan is under review by the <br />Met Council and has not formally been adopted by the City of Lino Lakes. Therefore, <br />the 2030 Comprehensive Plan is in effect. <br />Nadeau Acres is consistent with the goals and policies of the comprehensive plan in <br />regards to resource management, land use, housing, transportation and utilities. <br />Resource Management System Plan <br />Goals of the Resource Management System Plan include: <br />• Natural Resources and Amenities <br />o Goal # 1: Identify, protect and preserve the desirable natural areas and <br />ecological and aquatic resources of the community. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.