My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/08/2020 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2020
>
07/08/2020 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2021 3:50:09 PM
Creation date
7/2/2020 11:16:31 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/08/2020
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />7/012020 <br />Page 8 <br />Boulevard trees are required at the rate of one (1) tree per lot frontage for single family. <br />Comments: <br />1 Rai dpyardl troos shA, ildi he shown within the pity right _of_way. <br />2. Move plantings off of pFepesed stem; and r areas. <br />Noted. <br />• Floodplain <br />There are no existing floodplains on Nadeau Acres. <br />• Drainage and Utility Easements <br />Drainage and utility easements are proposed within the site where there is proposed storm sewer, <br />backyard swales, and stormwater management facilities. There is an existing 66-ft wide powerline <br />easement that runs from northeast to southwest through the middle of the site, and an existing 85-ft <br />wide powerline easement that runs along the western edge of the site. <br />The applicant is dedicating a 60-ft right-of-way along 20th Avenue (CSAH 54) and an 80-ft right-of-way <br />along Birch Street (CSAH 34). <br />Comments: <br />fi..ino a ..ide as the depth. <br />Easemen,���,_�..i_rereyise J to Z/Lfoo+ Storm sewer is approximately 1 4 5 feetT _o-__�.deep. <br />Inrl-irio hofi.ioon lots 155 And 154 150 andl 149 121 and? 12 ands 109 ands 108 <br />Added. <br />Let n rnhors ghangodi Turf Main+onango Anness Added. <br />3 Drainage and Utility Easements shall not be within powerline easements unless there is <br />documentation from the powerline company to use this space as an easement. <br />Easements revised. <br />Prior to final plat approval, the applicant needs to submit documentation that the power <br />company will grant drainage and utility easements. <br />Noted. In process. Xcel is in process of finalizing an approval and Great River Energy <br />have provided approval. Formal approval to be provided once received. <br />details). <br />Retaining walls removed from right of way ;;nri c;t--h streets/temporary dead ends pulled back tn- <br />allew for gradlipg OR site <br />Provide documentation of grading and utility agreement within the NSP powerline easements (85-ft <br />wide easement and 66-ft wideeasement). <br />In Process. — Permit Application submitted 02-24-2020 <br />6. GradiRg fer the eutlet fA-.r Pend 10-0- .*'-; OR adjaGeRt private property and will <br />Nintpd woll hp nAArdonatpri with preperty ewmar Plans will he adjusted aGGGrdiRgly easemeRt <br />Plans hAyp hoop adjusted. <br />7 Sheet 6- shoving the ghost plot isMOSSORg from the plan so+ dla+odl 3/'7!1/' 020 <br />Chao+ G: ail dlodJ <br />8. Outlots should be reviewed for drainage and utility easement requirements. <br />9. The culvert crossing under Red Oak Lane is shown within the right of way however grading to match <br />shall be completed through a temporary easement/right of entry obtained prior to construction. <br />Nadeau Acres Engineering Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.