Laserfiche WebLink
I\ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />III <br />I <br />I <br />II <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br />/ I <br />I <br />I <br />I <br />i l <br />I <br />I <br />I <br />I <br />/ <br />I / <br />�NSTALL TREE P,0fECTIVj,_/z, <br />F NCE ON PERfMETER R9' <br />NO�GRADIN AREA// <br />LANDSCAPE SPECIFICATIONS <br />1. TREE PROTECTION, ALL TREES NOT SPECIFICALLY NOTED OR MARKED ON SITE FOR REMOVAL SHALL <br />REMAIN PROTECTED AND UNDISTURBED DURING CONSTRUCTION. TREE PROTECTION AREA SHALL <br />INCLUDE ONE(1) FOOT RADIUS FROM TRUNK FOR EACH ONE(1) INCH DBH, "THIN WHICH NO <br />CONSTRUCTION ACTIVITY, MATERIAL STORAGE, OR VEHICLE PARKING SHALL BE PERMITTED. TREE <br />PROTECTION FENCING SHALL BE ERECTED PRIOR TO CONSTRUCTION START PER PLANS OR AS <br />DIRECTED BY OWNER/LANDSCAPE ARCHITECT AND SHALL CONSIST OF 4' TALL HEAVY DUTY ORANGE <br />CONSTRUCTION FENCING WITH 6' STEEL FENCE POSTS SPACED 6' O.C. MAX. <br />2. EROSION CONTROL. REFER TO CIVIL PLAN SHEETS FOR STORMWATER POLLUTION PREVENTION PLAN <br />(SWPPP), AND TEMPORARY AND PERMANENT STORMWATER BMPS, INCLUDING SILT FENCE, <br />BIO—ROLLS, INLET PROTECTION, EROSION CONTROL BLANKETING, DUST CONTROL, SWEEPING AND <br />ROCK CONSTRUCTION ENTRANCE. ALL DISTURBED AREAS SHALL RECEIVE PERMANENT STABILIZATION <br />IN ACCORDANCE WITH THE LANDSCAPE PLAN WITHIN 7 DAYS AFTER CONSTRUCTION ACTIVITY IN THE <br />DISTURBED AREA HAS CEASED. IN THE EVENT PERMANENT STABILIZATION CANNOT BE IMPLEMENTED <br />WITHIN 7 DAYS, TEMPORARY STABILIZATION BMPS MUST BE IMPLEMENTED WITHIN 7 DAYS USING <br />EITHER MnDOT RAPID STABILIZATION METHOD 3 (UNDER 4:1 SLOPES) OR METHOD 4 (OVER 4:1 <br />SLOPES). <br />3. CLEARING AND GRUBBING. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEARING AND GRUBBING ALL <br />AREAS INDICATED AS BEING DISTURBED OR OTHERWISE SHOWN ON PLANS. CLEARING AND GRUBBING <br />SHALL INCLUDE REMOVAL AND DISPOSAL OF ALL TREES, STUMPS, BRUSH, GRASS, ROOTS AND <br />OTHER ORGANIC MATERIAL AT AN APPROVED OFF —SITE DISPOSAL LOCATION. <br />4. SOIL PREPARATION, REFER TO GEOTECHNICAL REPORT FOR ANY REQUIRED SOIL CORRECTIONS, <br />AMENDMENTS OR ADDITIONAL INFORMATION (IF APPLICABLE). EXISTING TOPSOIL SHALL BE STRIPPED <br />FROM ALL DISTURBED AREAS AND STOCKPILED IN AN APPROVED LOCATION FOR RE —SPREAD. ALL <br />AREAS WHERE SOIL HAS BEEN COMPACTED BY CONSTRUCTION ACTIVITY AND THAT ARE INDICATED <br />TO BE SODDED, SEEDED OR PLANTING BED SHALL BE DE —COMPACTED TO A MINIMUM DEPTH OF 12 <br />INCHES BY SOIL RIPPING, TILLING OR OTHER APPROVED SOIL LOOSENING METHOD. <br />5. TOPSOIL MATERIAL. ALL EXISTING, AMENDED OR IMPORTED TOPSOIL SHALL MEET THE REQUIREMENTS <br />OF MnDOT 3877-2 LOAM TOPSOIL BORROW. A MINIMUM 6 INCH DEPTH OF TOPSOIL SHALL BE <br />PLACED ON ALL AREAS TO BE SODDED OR SEEDED. A MINIMUM 12 INCH DEPTH OF TOPSOIL SHALL <br />BE PLACED WITHIN ALL PLANTING BED AREAS. ALL TOPSOIL SHALL BE FINE GRADED, RAKED AND <br />DRAGGED TO PROVIDE A SMOOTH, UNIFORM SURFACE. TOPSOIL GRADES SHALL BE WITHIN .1 FEET <br />OF INDICATED FINISHED GRADE AND SHALL BE TRUE TO GRADIENTS SHOWN ON PLANS. REFER TO <br />CIVIL PLAN SHEETS FOR FILTRATION BASIN SOIL REQUIREMENTS. <br />6. SEEDING AND TURF ESTABLSHMENT. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S <br />APPROVAL OF FINAL GRADES AND TOPSOIL PREP PRIOR TO SEEDING. APPLY 12-12-12 GRANULAR <br />STARTER FERTILIZER AT A RATE OF 250 LEIS PER ACRE PRIOR TO SEEDING.. SEEDS SHALL BE <br />SOWED IN 2 PERPENDICULAR PASSES, EACH PASS AT ONE—HALF THE INDICATED RATE, NA <br />BROADCAST SPREADER, DROP SEEDER OR DRILL SEEDER. FOLLOWING SEED APPLICATION, INSTALL <br />TYPE 3N EROSION CONTROL BLANKET ON ALL SLOPES GREATER THAN 4:1. IN ALL OTHER AREAS, <br />APPLY HYDROMULCH COVER (MUST BE A SEPARATE OPERATION FROM SEEDING) AT A TARGETED <br />DRY WEIGHT RATE OF 3500 LEIS PER ACRE. SOIL SHALL BE KEPT MOIST DURING ESTABLISHMENT <br />WITH ADDITIONAL RE —SEEDING AS NECESSARY TO ACHIEVE A HEALTHY, UNIFORM STAND OF GRASS, <br />FREE OF WEEDS AND WITH COVERAGE EXCEEDING 75% IN ANY 10'v1O' AREA PRIOR TO FINAL <br />ACCEPTANCE. <br />7, SODDING. CONTRACTOR SHALL OBTAIN OWNER/LANDSCAPE ARCHITECT'S APPROVAL OF FINAL <br />GRADES AND TOPSOIL PREP PRIOR TO SODDING. APPLY 12-12-12 GRANULAR STARTER FERTILIZER <br />AT A RATE OF 250 LEIS PER ACRE PRIOR TO SODDING AND ROLL TOPSOIL TO CREATE A UNIFORM <br />SURFACE FOR LAYING SOD. SOD SHALL NOT BE CUT MORE THAN 24—HOURS IN ADVANCE OF <br />INSTALLATION, CONTRACTOR SHALL KEEP SOD MOIST FOR A MINIMUM OF 30 DAYS AND SHALL BE <br />RESPONSIBLE FOR MAINTAINING THE SOD UNTIL FINAL ACCEPTANCE. <br />8. PLANT MATERIAL. ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR <br />NURSERY STOCK," ANSI—Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, <br />INC. AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS. <br />OWNERAANDSCAPE ARCHITECT RESERVE THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED <br />UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION. NO SUBSTITUTION OF PLANT MATERIAL <br />SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY THE OWNERAANDSCAPE ARCHITECT PRIOR <br />TO INSTALLATION. <br />9. PLANT INSTALLATION AND ESTABLISHMENT. REFER TO STANDARD PLANTING DETAILS. CONTRACTOR <br />SHALL STAKE TREE LOCATIONS FOR APPROVAL BY OWNER/LANDSCAPE ARCHITECT PRIOR TO <br />PLANTING. ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL <br />ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH <br />MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE. <br />10. MULCH MATERIAL, DOUBLE SHREDDED HARDWOOD MULCH OR ROCK MULCH AS INDICATED ON PLANS. <br />ALL MULCH SHALL BE CLEAN AND FREE OF NOXIOUS WEEDS, SOIL, OR OTHER DELETERIOUS <br />MATERIAL, AND SHALL BE INSTALLED OVER A NON —WOVEN GEOTEXTILE FABRIC (INCIDENTAL) OR <br />OTHER APPROVED WEED BARRIER TO A MINIMUM SETTLED DEPTH OF 4". MULCH SHALL BE HELD <br />BACK FROM PLANT STEMS/TRUNKS A MINIMUM OF 3". WOOD MULCH SHALL BE PLACED AROUND <br />INDIVIDUAL TREES TO A 4' MINIMUM DIAMETER. MULCH SHALL BE INSTALLED WITHIN 48—HOURS OF <br />PLANT INSTALLATION. <br />11. MODULAR BLOCK RETAINING WALLS. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND <br />INSTALLATION OF A MODULAR BLOCK RETAINING WALL SYSTEM INCLUDING EXCAVATION, BEDDING, <br />BACKFILL, DRAINTILE AND GEOTEX TILE AS NECESSARY. ANY WALL EXCEEDING 30 INCHES IN HEIGHT <br />MAY REWIRE 42" TALL PROTECTIVE FENCING. ANY WALL EXCEEDING 48 INCHES IN HEIGHT MUST BE <br />DESIGNED BY AN ENGINEER LICENSED IN THE STATE OF MINNESOTA. CONTRACTOR SHALL SUBMIT <br />SHOP DRAWINGS FOR EACH RETAINING WALL FOR APPROVAL BY THE OWNER/LANDSCAPE ARCHITECT <br />PRIOR TO STARTING CONSTRUCTION. <br />12. LANDSCAPE EDGING, INSTALL LANDSCAPE EDGING BETWEEN ALL MULCH AREAS AND TURF. EDGING <br />SHALL BE COMMERCIAL GRADE BLACK POLYETHYLENE OR VINYL EDGING, 0.1 INCH THICK BY 5 <br />INCHES DEEP, V—LIPPED BOTTOM, HORIZONTALLY GROOVED, 1—INCH ROUND TOP, EXTRUDED IN <br />STANDARD LENGTHS, WITH 9—INCH STEEL ANGLE STAKES. <br />13. IRRIGATION, DESIGN, FURNISH AND INSTALL A COMPLETE UNDERGROUND IRRIGATION SYSTEM FROM <br />APPROVED POINT(S)—OF—CONNECTION WITHIN THE SITE COVERING ALL TURF AND PLANTING AREAS <br />AS SHOWN ON THE LANDSCAPE PLAN. INCLUDES FLOW/PRESSURE TESTING, PLANS WITH DESIGN <br />CALCULATIONS, AS —BUILT DRAWINGS, LABOR, MATERIALS, EQUIPMENT, AND SERVICES FOR THE <br />TESTING, ADJUSTING, RETESTING AND READJUSTING AS REQUIRED TO PLACE THE SYSTEM IN AN <br />APPROVED OPERATING CONDITION. THE IRRIGATION SYSTEM SHALL INCLUDE THE DESIGN AND <br />INSTALLATION OF THE FOLLOWING: PIPING, METER AND BACKFLOW ASSEMBLIES, SPRINKLER HEADS, <br />CABINETS, VALVES AND VALVE BOXES, CONTROLLERS, CONTROL HIRING, FITTINGS, ELECTRICAL <br />CONNECTIONS, QUICK —COUPLERS, ALL OTHER NECESSARY ACCESSORIES, SYSTEM MANUALS, 1—YEAR <br />MAINTENANCE PERIOD INCLUDING 1 FALL WINTERIZATION AND 1 SPRING START—UP. IRRIGATION <br />PLANS TO BE PREPARED BY A QUALIFIED IRRIGATION DESIGNER AND SUBMITTED TO <br />OWNER/LANDSCAPE ARCHITECT FOR APPROVAL <br />14. MAINTENANCE. MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN <br />PLACE. PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE <br />PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE OF <br />THE GUARANTEE. MAINTENANCE SHALL INCLUDE MOWING, TRIMMING, WATERING, FERTILIZING, WEED <br />AND PESTICIDE CONTROL, MULCHING, REMOVAL OF DEAD MATERIALS, RE —SETTING PLANTS TO <br />PROPER GRADE AND KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER <br />SHALL ASSUME MAINTENANCE RESPONSIBIUTIES, HOWEVER, THE CONTRACTOR SHALL RETAIN <br />RESPONSIBILITY FOR ALL PLANT MATERIAL THROUGH THE COMPLETION OF THE WARRANTY PERIOD. <br />15. WATERING. UPON ESTABLISHMENT OF SEED AND INSTALLATION OF PLANTS, CONTRACTOR SHALL <br />MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS AND TURF AREAS A <br />MINIMUM OF ONCE A WEEK. MORE FREQUENT WATERING MAY BE REQUIRED DURING PERIODS OF HOT, <br />DRY WEATHER. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER. IN THE <br />ABSENCE OF PERMANENT IRRIGATION, TEMPORARY IRRIGATION, TREE WATERING BAGS, OR <br />HAND —WATERING ARE ACCEPTABLE. <br />16. FINAL ACCEPTANCE. UPON SUBSTANTIAL COMPLETION OF THE WORK, CONTRACTOR SHALL REQUEST <br />FINAL ACCEPTANCE OF THE WORK IN WRITING BY THE OWNER/LANDSCAPE ARCHITECT. IF ANY WORK <br />IS FOUND TO BE INCOMPLETE OR UNSATISFACTORY IN THE OPINION OF THE OWNER/LANDSCAPE <br />ARCHITECT, A WRITTEN PUNCH LIST WILL BE PREPARED USTING ALL ITEMS THAT REQUIRE <br />COMPLETING OR CORRECTING BEFORE FINAL ACCEPTANCE. <br />17, WARRANTY, ALL PLANTS, MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE YEAR <br />FROM THE DATE OF FINAL ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL <br />COVER THE FULL COST OF REPLACEMENT INCLUDING LABOR AND MATERIAL. <br />0 30 60 120 <br />(IN FEET) <br />3890 Pheasant Ridge Drive NE, Suite 100 I hereb rti that this Ian, specification Print Name: Ran I Rutt RLA Drawn: RlR Revisions: BL HOLDINGS, LLC <br />(Carlson en Blaine, MN 55449 Yce fy p peci y ^'/ 1. 01/14/2°Per Ciy Comm. NADEAU ACRES PRELIMINARY L2 <br />w ronmental or report was prepared by me or under my /�� 2. 02/28/20 Per City Comments. <br />• .engineering Phone: (763) 489-7900 direct Supervision and that I am a 1Uly Signature: ll4r- Designed: RlR 3. 03/23/20 Revised Layout per Owner. 7517 162nd Avenue N E of <br />McCain I surveying Fax: (763)489-7959 Licensed Landscape Architect under 4. 06103/20Per CityComments. Lino Lakes, Minnesota LANDSCAPE PLAN 2 <br />www.carlsonmccain.com the laws of the State of Minnesota. Date: 98/00/29 License #: 56346 Date: 9E/08/29 Columbus, MN 55025 <br />